Tenderwize
Retour à la recherche

Low-voltage systems and traffic lights works

Metropole Toulon-Provence-Mediterranee·TOULON, France·EUR 4.6M·Deadline Sep 02, 2026 · 9 days left·Open·Works
High value
Titre original de l'avis

France – Electrical wiring and fitting work – 26TRAV04 - BHN STPM - MARCHE DE TRAVAUX SYSTEMES COURANTS FAIBLES, GTC ET PRIORITE AUX FEUX - PHASE 1 DU TECHNOPÔLE DE LA MER A BIR-HAKEIM ET PHASE 2a SEMR DE SAINTE-MUSSE

60/100

Score d'opportunité

Needs reviewHigh complexity
WorksOpen
Pourquoi ce score ?

Opportunité

60 / 100

Complexité

70 / 100

Facteurs de risque

Stringent qualification requirements may exclude bidders without specific certifications or equivalent experience (at l...

All documents must be submitted electronically and in French; missing or incorrect documents could lead to rejection.

Submission deadline in 9 days

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • EUR 4.6M estimated value
  • Works contract
  • 2 lots
  • Duration 36 MONTH
  • Cabling and electrical installation work
  • Installation of telecommunications equipment
Afficher le résumé complet

This tender by Metropole Toulon Provence Mediterranee is for works related to centralized technical management (GTC), weak currents, traffic signal priority, video surveillance, passenger station equipment, and central computer systems. It is divided into two lots: Lot 1 (CFA GTC) covers cabling, electrical installations, telecommunications, Ethernet network, command and control, video surveillance, network equipment/extension, access control, and public address systems; Lot 2 covers traffic control equipment, cabling, radio network, engineering studies, and junction signaling equipment. The procedure is open, with electronic submission required. The overall estimated value is EUR 4,597,697, with lot values of EUR 4,354,897 and EUR 242,800 respectively. The deadline for submission is 2026-09-02 23:59 CEST.

Risques

Stringent qualification requirements may exclude bidders without specific certifications or equivalent experience (at l...

All documents must be submitted electronically and in French; missing or incorrect documents could lead to rejection.

Submission deadline in 9 days

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Social insertion hours: Lot 1: 140 hours; Lot 2: 35 hours.
  • Environmental and social clauses apply per RC and CCAP.

Certifications

  • Qualification certificates: For Lot 1: QUALIFELEC MGTI and CFMGTI (or equivalent); For Lot 2: QUALIFELEC TN4 (or equivalent).

Critères d'attribution

Lot 1

Technical value: 60% (weight code poi-exa)60%Price of works: 30% (weight code poi-exa)30%Environmental protection performance: 10% (weight code poi-exa)10%

Lot 2

Technical value: 60% (weight code poi-exa)60%Price of works: 30% (weight code poi-exa)30%Environmental protection performance: 10% (weight code poi-exa)10%

Acheteur

Localisation

TOULON, FRA

Profil acheteur

Ouvrir le profil

Identifiant

24830054300217

Activité

Urban railway, tramway, trolleybus or bus services

Lots (2)

LOT-0001

Lot 1: CFA GTC - Cabling and Electrical Installations, Telecommunication and Control Systems

Cabling and electrical installation work, installation of telecommunications equipment, Ethernet network, command and control system, video surveillance system, network equipment, network upgrade, access control system, and public address systems. Includes a firm tranche (36 months) and an optional tranche (18 months). Social insertion requirement: 140 hours minimum.

WorksElectronic submission

EUR 4.6M

Valeur estimée

Localisation

TOULON, France

Durée

36 MONTH

Catégorie

Electrical wiring and fitting work

Critères d'attribution

Price

Date limite

Deadline Sep 02, 2026

LOT-0002

Lot 2: Traffic Signal Priority - Installation of Traffic Control Equipment and Cabling

Installation of traffic control equipment, cabling and electrical installation work, radio network, engineering studies, and junction signaling equipment. Includes a firm tranche (36 months) and an optional tranche (18 months). Social insertion requirement: 35 hours minimum.

WorksElectronic submission

EUR 4.6M

Valeur estimée

Localisation

TOULON, France

Durée

36 MONTH

Catégorie

Electrical wiring and fitting work

Critères d'attribution

Price

Date limite

Deadline Sep 02, 2026

Détails de la procédure

Date de publication
06 Jul 2026
Langues
French

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
465019-2026

Documents (1)

Appels d'offres similaires