Development of Aleja Niepodległości from Kupiecka to Bohaterów Westerplatte - Stormwater Stage II

Miasto Zielona Góra - Urząd Miasta Zielona Góra·Zielona Góra, Poland·Expired · Jul 24, 2026·Open·Works
Structured notice only
Titre original de l'avis

Poland – Construction work – Zagospodarowanie ul. Aleja Niepodległości na odcinku od ulicy Kupieckiej do ulicy Bohaterów Westerplatte w ramach zadania: Wody opadowe – etap II

40/100

Score d'opportunité

Needs reviewHigh complexity
WorksExpired
Pourquoi ce score ?

Opportunité

40 / 100

Complexité

70 / 100

Facteurs de risque

Full procurement documents (SWZ) were not analyzed; critical details on scope, requirements, and contract conditions ma...

Only about 19 days from publication to submission deadline; insufficient time for thorough bid preparation, especially...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Informations clés

Pouvoir adjudicateur
Miasto Zielona Góra - Urząd Miasta Zielona Góra
Pays
Pologne
CPV
45000000 - Construction work +19 autres
Date limite
Jul 24, 2026

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 1 lot
  • Duration 20 MONTH
  • Reconstruction of pavement in Aleja Niepodległości (pedestrian precinct) with green-blue infrastructure elements
  • Separation of combined sewer system through construction of stormwater drainage and retention tanks
Afficher le résumé complet

Tender for the development of Aleja Niepodległości street in Zielona Góra, including road surface renovation with green-blue infrastructure elements and separation of combined sewer systems through construction of stormwater drainage and channel retention, as part of a stormwater management project (Stage II) co-financed by EU funds.

Risques

Full procurement documents (SWZ) were not analyzed; critical details on scope, requirements, and contract conditions ma...

Only about 19 days from publication to submission deadline; insufficient time for thorough bid preparation, especially...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Technical experience: at least one road/infrastructure project with >4,000 m² of granite paving, one external lighting project, one small architecture/greenery project, and two...
  • Personnel: key roles including road works manager (with granite paving experience), construction works manager, sanitary works manager (with sewer experience), electrical works...

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price criterion weighted at 60% — 60%Warranty extension criterion weighted at 40% — 40%

Acheteur

Localisation

Zielona Góra, POL

Profil acheteur

Ouvrir le profil

Identifiant

NIP: 9731007458

Activité

General public services

Lots (1)

LOT-0001

Development of Aleja Niepodległości from Kupiecka to Bohaterów Westerplatte - Stormwater Stage II

The lot covers two tasks: (1) reconstruction of the pavement in Aleja Niepodległości (pedestrian precinct) with green-blue infrastructure elements, and (2) separation of the combined sewer system by building stormwater drainage and retention tanks. Works must be carried out according to project documentation and technical specifications. The investment is co-financed by EU funds under the FENX 01.02 programme.

WorksEU fundedElectronic submissionSME suitable

Localisation

Zielona Góra, Poland

Durée

20 MONTH

Catégorie

Construction work

Critères d'attribution

Price

Date limite

Expired Jul 24, 2026

Détails de la procédure

Date de publication
05 Jul 2026
Langues
Polish

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
461921-2026