Design and Construction of A1 – DJ 704 Road Junction

COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.·Bucuresti, Romania·RON 149.1M | EUR 28.5M·Expired · Jul 23, 2026·Open·Works
High valueStructured notice only
Titre original de l'avis

Romania – Construction work for highways, roads – Proiectare si Executie Nod Rutier A1 (km 326+155) – DJ 704 (Cugir)

50/100

Score d'opportunité

Needs reviewHigh complexity
WorksExpired
Pourquoi ce score ?

Opportunité

50 / 100

Complexité

75 / 100

Facteurs de risque

Submission deadline is only 21 days after notice publication, which is unusually short for a contract of this complexit...

Inconsistency in submission deadline time between structured data (12:00) and XML notice (15:00). This could lead to re...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Informations clés

Pouvoir adjudicateur
COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.
Pays
Roumanie
CPV
45233100 - Construction work for highways, roads +3 autres
Date limite
Jul 23, 2026
Valeur estimée
RON 149.1M (approx. EUR 28.5M)

Aperçu

Moderate opportunity

Faits clés

  • RON 149.1M estimated value
  • Works contract
  • 1 lot
  • Duration 78 MONTH
  • Design and construction of a grade-separated road junction on A1 motorway (km 326+155) connecting to DJ 704 (Cugir)
  • Includes geotechnical studies, environmental assessments, technical design, and execution
Afficher le résumé complet

Design and execution of a road junction on the A1 motorway (km 326+155) connecting to DJ 704 near Cugir, Romania. The contract includes both design and construction. Estimated value: 149,112,769.48 RON. Open procedure, EU-funded. Submission deadline: 2026-07-23 (note time inconsistency: 12:00 vs 15:00). Award criteria: price (40%), warranty period (12%), experience of key personnel (30% total), and implementation methodology (18%). Only one lot.

Risques

Submission deadline is only 21 days after notice publication, which is unusually short for a contract of this complexit...

Inconsistency in submission deadline time between structured data (12:00) and XML notice (15:00). This could lead to re...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Tenderers must be legally registered and have a relevant CAEN code
  • Proposed key personnel must have specific experience in road infrastructure projects

Administrative

  • Must submit DUAE (European Single Procurement Document)

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price: 40% - lowest price gets maximum points. — 40%Warranty period: 12% - minimum 60 months, maximum 120 months. 0.2 points per additional month beyond 60. — 12%Project Manager experience: 10% - points for participation in 2, 3, or 4+ similar contracts. — 10%Design Team Leader experience: 10% - points for participation in 2, 3, or 4+ similar design contracts. — 10%Road Design Engineer experience: 10% - points for participation in 2, 3, or 4+ similar design contracts. — 10%Methodology: 18% - detailed description of activities, resources, environmental measures, etc. Maximum points for comprehensive understanding. — 18%

Acheteur

Localisation

Bucuresti, ROU

Profil acheteur

Ouvrir le profil

Identifiant

16054368

Activité

General public services

Lots (1)

LOT-0000

Design and Construction of A1 – DJ 704 Road Junction

Design and construction of a grade-separated junction (nod rutier) on A1 motorway at km 326+155 connecting to DJ 704 (Cugir), including all necessary studies, technical design, construction, and related works. The contract allows for modifications under specific conditions (e.g., changes in design, environmental requirements, archaeological findings).

WorksEU fundedElectronic submission

EUR 28.5M

Valeur estimée

Localisation

RO321, Romania

Durée

78 MONTH

Catégorie

Construction work for highways, roads

Critères d'attribution

Price

Date limite

Expired Jul 23, 2026

Détails de la procédure

Date de publication
02 Jul 2026
Langues
Romanian

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
457312-2026