Overhead Line Adjustment Freimann Including Planning
Titre original de l'avis
Germany – Railway construction works – SV-CMÜ-260422-005 - Tram Münchner Norden, Oberleitungsanp. Ordnungsgruppe Freimann inkl. Planung
Score d'opportunité
Pourquoi ce score ?
Opportunité
25 / 100
Complexité
60 / 100
Facteurs de risque
The submission deadline is only 9 days from publication. This may already have passed, and even if not, leaves very lit...
No estimated value is disclosed. This makes it difficult to determine if the contract is financially viable, especially...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Aperçu
Moderate opportunityFaits clés
- Works contract
- 1 lot
- Duration until May 2027
- Dismantling existing DB overhead line (including foundations)
- Construction of deep foundations and mast foundations
Afficher le résumé complet
This tender by Stadtwerke München GmbH (SWM) concerns the adjustment of Deutsche Bahn (DB) overhead line infrastructure (catenary) for the new tram line 'Münchner Norden' at the Freimann marshalling yard. The scope includes dismantling existing overhead lines, constructing deep foundations, installing new masts and catenary systems, and providing as-built documentation. The tender is a single-lot, open procedure under German sector regulations (SektVO). The publication date is 2026-07-01, with a submission deadline of 2026-07-10 (updated extension). The contract is planned to run from 2026-08-17 to 2027-05-28. No estimated contract value is published. Award is based 100% on price. Eligibility requires registration in a professional register, turnover in comparable works, average annual staff numbers, references from the last 5 years, and a valid DB prequalification for overhead line works.
Risques
The submission deadline is only 9 days from publication. This may already have passed, and even if not, leaves very lit...
No estimated value is disclosed. This makes it difficult to determine if the contract is financially viable, especially...
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Valid DB prequalification for overhead line works required
- References for comparable works within the last 5 years (including contract value and duration)
Eligibility
- Declaration of turnover in comparable works over last 3 years
Les exigences peuvent être incomplètes.
Critères d'attribution
Lot 1
Acheteur
Localisation
München, DEU
Site web
Profil acheteur
Identifiant
DE812500229
Activité
Urban railway, tramway, trolleybus or bus services
Lots (1)
LOT-0000
Overhead Line Adjustment Freimann Including Planning
Adjustment of DB overhead line at Munich Freimann (tracks 8-15 and feeder track) as part of the new tram line. Scope includes: execution planning (LPH 5), dismantling existing overhead line including foundations, deep foundations for new masts, new masts and catenary, and as-built documentation per DB standards.
Localisation
Durée
Catégorie
Critères d'attribution
Date limite
Détails des critères
Gewichtung: 100 %
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Titre original du lot
SV-CMÜ-260422-005 - Tram Münchner Norden, Oberleitungsanp. Ordnungsgruppe Freimann inkl. Planung
Description TED originale
Mit Neubau des Brückenbauwerkes zur Überquerung des DB-Nordrings ist die Oberleitung der DB anzupassen. Betroffen sind die Gleise 8 bis 15 der Ordnungsgruppe München Freimann und das Zuführungsgleis in Richtung Abstellbahnhof Freimann. Vor Beginn der Hauptbaumaßnahme zur Neubaustrecke Tram Münchner Norden muss die Oberleitungsanlage (OLA) DB in o.g. Bereichen angepasst werden. Insbesondere sind folgende Leistungen beinhaltet: Ausführungsplanung LPH 5 (HOAI), Rückbau bestehender OLA-Anlage inkl. Gründungen, Herstellung Tiefgründungen inkl. Fundamentierung der OLA-Masten, Herstellung der neuen OLA-Masten inkl. Kettenwerke, Erstellung der Bestandsunterlagen der neuen OLA-Anlage gemäß Regelwerk DB.
Détails de la procédure
- Date de publication
- 01 Jul 2026
- Langues
- German
Métadonnées de référence
- Base juridique
- 32014L0025
Identifiants de référence
- ID de l'appel d'offres
- 452905-2026
Documents (1)
Appels d'offres similaires
Score d'opportunité
Pourquoi ce score ?
Opportunité
25 / 100
Complexité
60 / 100
Facteurs de risque
The submission deadline is only 9 days from publication. This may already have passed, and even if not, leaves very lit...
No estimated value is disclosed. This makes it difficult to determine if the contract is financially viable, especially...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications