Tenderwize
Retour à la recherche

Overhead Line Adjustment Freimann Including Planning

Stadtwerke München GmbH·München, Germany·Expired · Jul 10, 2026·Open·Works
Structured notice only
Titre original de l'avis

Germany – Railway construction works – SV-CMÜ-260422-005 - Tram Münchner Norden, Oberleitungsanp. Ordnungsgruppe Freimann inkl. Planung

25/100

Score d'opportunité

Needs reviewMedium complexity
WorksExpired
Pourquoi ce score ?

Opportunité

25 / 100

Complexité

60 / 100

Facteurs de risque

The submission deadline is only 9 days from publication. This may already have passed, and even if not, leaves very lit...

No estimated value is disclosed. This makes it difficult to determine if the contract is financially viable, especially...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 1 lot
  • Duration until May 2027
  • Dismantling existing DB overhead line (including foundations)
  • Construction of deep foundations and mast foundations
Afficher le résumé complet

This tender by Stadtwerke München GmbH (SWM) concerns the adjustment of Deutsche Bahn (DB) overhead line infrastructure (catenary) for the new tram line 'Münchner Norden' at the Freimann marshalling yard. The scope includes dismantling existing overhead lines, constructing deep foundations, installing new masts and catenary systems, and providing as-built documentation. The tender is a single-lot, open procedure under German sector regulations (SektVO). The publication date is 2026-07-01, with a submission deadline of 2026-07-10 (updated extension). The contract is planned to run from 2026-08-17 to 2027-05-28. No estimated contract value is published. Award is based 100% on price. Eligibility requires registration in a professional register, turnover in comparable works, average annual staff numbers, references from the last 5 years, and a valid DB prequalification for overhead line works.

Risques

The submission deadline is only 9 days from publication. This may already have passed, and even if not, leaves very lit...

No estimated value is disclosed. This makes it difficult to determine if the contract is financially viable, especially...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Valid DB prequalification for overhead line works required
  • References for comparable works within the last 5 years (including contract value and duration)

Eligibility

  • Declaration of turnover in comparable works over last 3 years

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price 100%100%

Acheteur

Localisation

München, DEU

Site web

www.swm.de

Profil acheteur

Ouvrir le profil

Identifiant

DE812500229

Activité

Urban railway, tramway, trolleybus or bus services

Lots (1)

LOT-0000

Overhead Line Adjustment Freimann Including Planning

Adjustment of DB overhead line at Munich Freimann (tracks 8-15 and feeder track) as part of the new tram line. Scope includes: execution planning (LPH 5), dismantling existing overhead line including foundations, deep foundations for new masts, new masts and catenary, and as-built documentation per DB standards.

WorksElectronic submissionSME suitable

Localisation

DE212, Germany

Durée

Aug 2026 - May 2027

Catégorie

Railway construction works

Critères d'attribution

Price

Date limite

Expired Jul 10, 2026

Détails de la procédure

Date de publication
01 Jul 2026
Langues
German

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
452905-2026

Documents (1)

Appels d'offres similaires