Wastewater Treatment Plant Renewal Hamburg Langenfelde
Titre original de l'avis
Germany – Sewerage works equipment – ABA Werk HH-Langenfelde DB Fernverkehr - 545
Score d'opportunité
Pourquoi ce score ?
Opportunité
40 / 100
Complexité
60 / 100
Facteurs de risque
Procedure type 'neg-w-call' (negotiated without prior call) suggests limited transparency and possible urgency, reducin...
No estimated value or budget disclosed, making financial risk assessment impossible.
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Informations clés
- Pouvoir adjudicateur
- DB Fernverkehr AG (Bukr 13)
- Pays
- Allemagne
- CPV
- 39350000 - Sewerage works equipment
- Date limite
- Jul 23, 2026
Aperçu
Moderate opportunityFaits clés
- Supplies contract
- 1 lot
- Supply and installation of water and wastewater treatment plant
- Supply of water recovery plant(s)
Afficher le résumé complet
This tender by DB Fernverkehr AG for the renewal of a wastewater treatment plant (sewerage works equipment) at the Hamburg Langenfelde depot involves the supply and installation of water and wastewater treatment equipment, water recovery systems, pump technology, media supply, and control systems. It also includes dismantling and reuse of existing systems. The tender is a single lot, EU-funded, and uses a negotiated procedure without prior call (neg-w-call). The award is based solely on price (100% weighting). No estimated value is provided. Eligibility criteria are only available via an external link. Submission is electronic, deadline is 23 July 2026, 15:00 CEST. Variants are allowed. The notice is in German; no other documents were analyzed.
Risques
Procedure type 'neg-w-call' (negotiated without prior call) suggests limited transparency and possible urgency, reducin...
No estimated value or budget disclosed, making financial risk assessment impossible.
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- EU-funded project (no-eu-funds in XML indicates no EU funding? contradicting structured data; structured data says EU funded, but XML says no-eu-funds. Inconsistency noted.)
- Variants allowed
Administrative
- Electronic submission required
Les exigences peuvent être incomplètes.
Critères d'attribution
Lot 1
Acheteur
Localisation
Frankfurt Main, DEU
Identifiant
2ae75dcf-a462-419c-8753-8b96ab91631d
Activité
Railway services
Lots (1)
LOT-0001
Wastewater Treatment Plant Renewal Hamburg Langenfelde
Renewal of a wastewater treatment plant for train exterior cleaning, including water/wastewater treatment, water recovery, pump technology, media supply, control system, and dismantling/reuse of existing equipment.
Localisation
Catégorie
Critères d'attribution
Date limite
Détails des critères
Preis
Note sur la valeur
Afficher les données TED originales
Titre original du lot
ABA Werk HH-Langenfelde DB Fernverkehr - 545
Description TED originale
Die DB FV im Werk Hamburg Langenfelde beabsichtigt die Erneuerung einer Abwasserbehandlungsanlage für eine Außenreinigungsanlage (ARA) für die am Standort instand zuhaltenden Züge. Die maschinentechnische Ausrüstung der Anlage, die im Rahmen dieser Ausschreibung beschafft werden soll, besteht aus den folgenden Komponenten: - Wasser- und Abwasserbehandlungsanlage - Wasserrückgewinnungsanlage(n) - Pumpentechnik und Medienversorgung - Anlagensteuerung - Rückbau und Weiternutzung Bestandstechnik
Détails de la procédure
- Date de publication
- 30 Jun 2026
- Langues
- German
Métadonnées de référence
- Base juridique
- 32014L0025
Identifiants de référence
- ID de l'appel d'offres
- 452555-2026
Documents (1)
Score d'opportunité
Pourquoi ce score ?
Opportunité
40 / 100
Complexité
60 / 100
Facteurs de risque
Procedure type 'neg-w-call' (negotiated without prior call) suggests limited transparency and possible urgency, reducin...
No estimated value or budget disclosed, making financial risk assessment impossible.
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications