Tenderwize
Retour à la recherche

Accessibility link design and build

Département de la santé et des mobilités - Office cantonal des transports - Direction des transports collectifs, professionnels et du développement multimodal·Petit-Lancy, Switzerland·Deadline Aug 31, 2026 · 10 days left·Open·Works
Structured notice only
Titre original de l'avis

Switzerland – Cable-supported transport systems with cabins – Halte de Russin - Création d'une liaison d'accessibilité par transport hectométrique

40/100

Score d'opportunité

Needs reviewMedium complexity
WorksOpen
Pourquoi ce score ?

Opportunité

40 / 100

Complexité

65 / 100

Facteurs de risque

Estimated value and detailed award criteria are missing. No procurement documents were analyzed. This makes it impossib...

Landscape integration approval from CFNP is a condition. Failure could delay or cancel project. This introduces uncerta...

Submission deadline in 10 days

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 1 lot
  • Complete design of the hectometric transport system (inclined elevator or funicular)
  • Obtaining all necessary building permits and concession requests
Afficher le résumé complet

This open tender by the Cantonal Office of Transport in Geneva, Switzerland, concerns the design, construction, supply, commissioning, and 10-year maintenance of a hectometric transport link (inclined elevator or funicular) connecting Russin railway station to the village. Key requirements include obtaining building permits, landscape integration approval from the Swiss Federal Commission for Nature and Landscape Protection, and periodic maintenance for 10 years. The procedure is open, but electronic submission is not allowed. The estimated value is not disclosed. No procurement documents were analyzed beyond the notice.

Risques

Estimated value and detailed award criteria are missing. No procurement documents were analyzed. This makes it impossib...

Landscape integration approval from CFNP is a condition. Failure could delay or cancel project. This introduces uncerta...

Submission deadline in 10 days

No procurement documents available

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Landscape integration must meet the requirements of the Swiss Federal Commission for Nature and Landscape Protection (CFNP) – a condition for project realization
  • Must engage a landscape architect from the project phase
  • 10-year maintenance period after commissioning

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Quality-based award criteria (weight not specified).

Acheteur

Lots (1)

LOT-0000

Accessibility link design and build

Design, realization, supply, commissioning, and 10-year maintenance of a hectometric transport system (inclined elevator or funicular) between Russin railway halt and village. Includes obtaining permits, civil works, mechanical/electromechanical equipment, and landscape integration.

WorksEU fundedElectronic submission

Localisation

Russin, Switzerland

Catégorie

Cable-supported transport systems

Critères d'attribution

Quality

Date limite

Deadline Aug 31, 2026

Détails de la procédure

Date de publication
30 Jun 2026
Langues
French

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
452265-2026

Appels d'offres similaires