Tenderwize
Retour à la recherche

Supply of cooling towers with 25 MW total capacity, 2nd construction phase

SWM Services GmbH·München, Germany·Expired · Aug 03, 2026·Neg W Call·Supplies
Structured notice only
Titre original de l'avis

Germany – Cooling towers – Die Lieferung von Kühltürmen mit einer Gesamt-Rückkühlleistung von 25 MW, 2. Bauabschnitt.

40/100

Score d'opportunité

Needs reviewHigh complexity
SuppliesExpired
Pourquoi ce score ?

Opportunité

40 / 100

Complexité

70 / 100

Facteurs de risque

No estimated value provided – cannot assess financial scale or competitive pricing.

Award criteria only stated as 'cost' with details to be announced later – unknown if price-only or weighted.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Supplies contract
  • 1 lot
  • Duration until May 2028
  • Design, manufacture, and delivery of hybrid cooling towers (total cooling capacity 25 MW)
  • Cooling water performance: inlet 37°C to outlet 27°C
Afficher le résumé complet

Supply and installation of hybrid cooling towers with a total capacity of 25 MW for the second construction phase of a district cooling center in Munich. The procurement includes cooling tower supply, blowdown automation, water conditioning with biocide dosing, crane installation, cabling, and substructure. Negotiated procedure without call for competition. No estimated value published. Deadline for participation requests: 2026-08-03. Planned execution: June 2027 to May 2028.

Risques

No estimated value provided – cannot assess financial scale or competitive pricing.

Award criteria only stated as 'cost' with details to be announced later – unknown if price-only or weighted.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Hybrid cooling tower design required
  • Total cooling capacity 25 MW
  • Cooling performance: 37°C to 27°C

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Cost criterion; details not available in notice.

Acheteur

Localisation

München, DEU

Profil acheteur

Ouvrir le profil

Identifiant

DE813863509

Activité

Electricity-related activities

Lots (1)

LOT-0000

Supply of cooling towers with 25 MW total capacity, 2nd construction phase

Hybrid cooling towers to cool water from 37°C to 27°C, including blowdown automation, water conditioning with biocide dosing, crane installation, cabling, control cabinets, cable trays, and substructure. Supply and installation at specified roof area.

SuppliesEU fundedElectronic submission

Localisation

München, Germany

Durée

Jun 2027 - May 2028

Catégorie

Cooling towers

Critères d'attribution

Cost

Date limite

Expired Aug 03, 2026

Détails de la procédure

Date de publication
30 Jun 2026
Langues
German

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
449871-2026

Documents (1)

Appels d'offres similaires