Hydraulic Groundwater Remediation
Titre original de l'avis
Germany – Groundwater pollution treatment or rehabilitation – Hydraulische Grundwassersanierung
Score d'opportunité
Pourquoi ce score ?
Opportunité
50 / 100
Complexité
70 / 100
Facteurs de risque
Groundwater has higher organic load and landfill byproducts, increasing treatment complexity and cost
No disclosed budget may lead to underestimation of costs
Restricted procedure — pre-qualification required
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Aperçu
Moderate opportunityFaits clés
- Services contract
- 1 lot
- Duration until Dec 2035
- Provision, operation, and maintenance of a groundwater treatment plant (GWRA) for LCKW-contaminated groundwater
- Minimum throughput of 8 m³/h
Afficher le résumé complet
Single lot restricted tender for provision, operation, and maintenance of a hydraulic groundwater treatment plant (GWRA) to remediate LCKW-contaminated groundwater at a landfill site in Waldeshöhe, Germany. Minimum throughput 8 m³/h; existing infrastructure (wells, pipes, power supply) available from a previous plant. Operation until 2035 with possible extension up to 4 years, followed by decommissioning. No estimated value disclosed. EU funding status is inconsistent between structured data (EU-funded) and XML notice (no EU funds). Submission only via eVergabe platform; deadline 2026-08-03 12:00 CET. Strict eligibility criteria including professional qualifications, references, and numerous forms.
Risques
Groundwater has higher organic load and landfill byproducts, increasing treatment complexity and cost
No disclosed budget may lead to underestimation of costs
Restricted procedure — pre-qualification required
No procurement documents available
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Minimum throughput 8 m³/h
Administrative
- Restricted procedure - must pre-qualify and be invited to submit full bid
- Submission only via eVergabe platform (www.meinauftrag.rib.de); email not allowed
Critères d'attribution
Lot 1
Acheteur
Localisation
Neubrandenburg, DEU
Site web
Profil acheteur
Identifiant
13-L45410001000-11
Activité
General public services
Lots (1)
LOT-0000
Hydraulic Groundwater Remediation
Provision, operation, and maintenance of a groundwater treatment plant (GWRA) for LCKW-contaminated groundwater with minimum throughput 8 m³/h. Includes aeration, iron removal, stripping with gas recirculation, catalytic oxidation (KatOx), HCl dosing, and 5 extraction pumps. Operation until 2035, then decommissioning. Existing infrastructure (wells, pipes, electricity, infiltration wells) already in place.
Localisation
Durée
Catégorie
Critères d'attribution
Date limite
Détails des critères
Der Zuschlag wird gemäß § 58 Abs. 1 VgV nach Maßgabe des § 127 GWB auf das wirtschaftlichste Angebot erteilt.
Codes CPV supplémentaires
Afficher les données TED originales
Titre original du lot
Hydraulische Grundwassersanierung
Description TED originale
Gestellung/Betreibung/Unterhaltung einer Grundwassersanierungsanlage (GWRA) zur Abreinigung von mit LCKW kontam. Grundwasser (GW), Durchsatz mind. 8 m³/h. Das GW weist eine höhere organische Belastung sowie Begleitschadstoffe aus einer Deponie auf. Die bisherige GWRA verfügt über eine Belüftung, Enteisenung, Strippanlage mit Kreisgasführung, KatOx-Anlage und HCI-Dosierung sowie 5 Förderpumpen. Die Anlage ist bis 2035 zu gestellen und zu betreiben, danach wieder rückzubauen. Die vorhandene Infrastruktur (Brunnen, Rohrleitungen, E-Anschluss, Versickerungsbrunnen ) besteht, da seit 2020 eine GWRA im Einsatz ist. Aus Wettbewerbsgründen wird diese GWRA neu ausgeschrieben.
Détails de la procédure
- Date de publication
- 30 Jun 2026
- Langues
- German
Métadonnées de référence
- Base juridique
- 32014L0024
Identifiants de référence
- ID de l'appel d'offres
- 449305-2026
Documents (1)
Score d'opportunité
Pourquoi ce score ?
Opportunité
50 / 100
Complexité
70 / 100
Facteurs de risque
Groundwater has higher organic load and landfill byproducts, increasing treatment complexity and cost
No disclosed budget may lead to underestimation of costs
Restricted procedure — pre-qualification required