Design and construction of national road DK73 section Pilzno - Brzostek

Skarb Państwa Generalny Dyrektor Dróg Krajowych i Autostrad ul. Wronia 53 00-874 Warszawa Prowadzący postępowanie: Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Rzeszowie 35-959 Rzeszów, ul. Legionów 20·Rzeszów, Poland·Expired · Jul 20, 2026·Open·Works
Structured notice only
Titre original de l'avis

Poland – Construction work for highways, roads – Zaprojektowanie i wykonanie zadania pn.: "Rozbudowa drogi krajowej nr 73 na odcinku Pilzno - Brzostek"

55/100

Score d'opportunité

Needs reviewHigh complexity
WorksExpired
Pourquoi ce score ?

Opportunité

55 / 100

Complexité

85 / 100

Facteurs de risque

No estimated value disclosed; budget uncertainty may affect feasibility and pricing.

Procurement documents (SWZ, PFU) were not analyzed; requirements may be incomplete or contain hidden conditions.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Informations clés

Pouvoir adjudicateur
Skarb Państwa Generalny Dyrektor Dróg Krajowych i Autostrad ul. Wronia 53 00-874 Warszawa Prowadzący postępowanie: Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Rzeszowie 35-959 Rzeszów, ul. Legionów 20
Pays
Pologne
CPV
45233100 - Construction work for highways, roads +7 autres
Date limite
Jul 20, 2026

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 1 lot
  • Duration 39 MONTH
  • Design and obtain necessary permits for road construction
  • Construction/upgrade of approx. 9.4 km of national road DK73, including demolition of existing road body
Afficher le résumé complet

This is an EU open tender for the design and construction of a 9.4 km section of national road DK73 between Pilzno and Brzostek in Podkarpackie, Poland. The contract includes road reconstruction, bridges, drainage, environmental protections, lighting, traffic management, and related works. The estimated value is not specified but stated to exceed EUR 5,404,000. Award is based 55% on price and 45% on quality criteria (extended warranties and asphalt recycling). The deadline for submission is 20 July 2026, 09:00 UTC. The procurement documents are available on the e-platform but were not analyzed.

Risques

No estimated value disclosed; budget uncertainty may affect feasibility and pricing.

Procurement documents (SWZ, PFU) were not analyzed; requirements may be incomplete or contain hidden conditions.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Design and construct a 9.4 km national road (DK73) section Pilzno-Brzostek
  • Duration: 39 months (excluding winter periods for construction; design includes winter periods)

Administrative

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price (55%) — 55%Extended warranty – noise barriers (20%) — 20%Extended warranty – bridges (20%) — 20%Asphalt recycling management (5%) — 5%

Acheteur

Lots (1)

LOT-0001

Design and construction of national road DK73 section Pilzno - Brzostek

Single lot covering design, construction, and related works for approximately 9.4 km of national road DK73, including bridge structures, intersections, pedestrian/cyclist infrastructure, drainage, environmental measures, lighting, traffic management, and utility relocation. Duration 39 months.

WorksEU fundedElectronic submission

Localisation

PL823, Poland

Durée

39 MONTH

Catégorie

Construction work for highways, roads

Critères d'attribution

Price

Date limite

Expired Jul 20, 2026

Détails de la procédure

Date de publication
29 Jun 2026
Langues
Polish

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
448566-2026

Documents (1)

Appels d'offres similaires