Tenderwize
Retour à la recherche

Project management for Enedis electrical networks construction

ENEDIS SA·Puteaux, France·EUR 27.1M·Expired · Jul 26, 2026·Neg W Call·Services·Framework
High valueStructured notice only
Titre original de l'avis

France – Engineering studies – Marche de maitrise d'œuvre déléguée pour la construction des réseaux électriques de distribution sous maitrise d’ouvrage Enedis - Direction Régionale Ile de France OUEST

60/100

Score d'opportunité

Needs reviewHigh complexity
ServicesFrameworkExpired
Pourquoi ce score ?

Opportunité

60 / 100

Complexité

75 / 100

Facteurs de risque

Procurement documents (technical specifications, contract terms, etc.) were not analyzed. Detailed requirements may aff...

The only award criterion disclosed is 'price is not the only criterion'; no weights or other criteria (e.g., quality, t...

No procurement documents available

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • EUR 27.1M estimated value
  • Framework procurement
  • Services contract
  • 3 lots
  • Duration until May 2032
  • Delegated project management (maîtrise d'œuvre déléguée) for construction and maintenance of electrical distribution networks
  • Services related to specific agencies: ACE (electricity columns), ARMA (business connections), AIGP (large projects)
Afficher le résumé complet

This is a negotiated procedure under the Utilities Directive for delegated project management services related to the construction of electrical distribution networks for Enedis in the Île-de-France Ouest region. The contract is divided into three lots corresponding to different agencies (ACE, ARMA, AIGP) and is structured as framework agreements with a base duration of 48 months, extendable up to 72 months. The total estimated value is EUR 27,100,000. Only the TED XML notice was analyzed; procurement documents were not available.

Risques

Procurement documents (technical specifications, contract terms, etc.) were not analyzed. Detailed requirements may aff...

The only award criterion disclosed is 'price is not the only criterion'; no weights or other criteria (e.g., quality, t...

No procurement documents available

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Variant offers are not allowed
  • The contract is awarded through a negotiated procedure with prior call for competition

Administrative

  • Bidders may submit offers for one, two, or all three lots (maximum 3 lots)

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price (weight not specified); other criteria not provided

Lot 2

Price (weight not specified); other criteria not provided

Lot 3

Price (weight not specified); other criteria not provided

Acheteur

Localisation

Puteaux, FRA

Profil acheteur

Ouvrir le profil

Identifiant

444 608 442

Activité

Electricity-related activities

Lots (3)

LOT-0001

ACE

Project management services for network construction related to the ACE agency (electricity columns agency). The lot is a framework agreement with an estimated value of EUR 6,346,000 and a framework maximum of EUR 7,932,500. Duration: 48 months firm, renewable twice for 12 months each (total up to 72 months). Includes a conditional tranche.

ServicesFrameworkEU fundedElectronic submission

EUR 27.1M

Valeur estimée

Localisation

FRZZZ, France

Durée

Feb 2027 - May 2032

Catégorie

Electrical services

Critères d'attribution

Price

Date limite

Expired Jul 26, 2026

LOT-0002

ARMA

Project management services for network construction related to the ARMA agency (business connection agency). Lot is a framework agreement with an estimated value of EUR 13,899,500 and a framework maximum of EUR 17,324,375. Duration: 48 months firm, renewable twice for 12 months each (total up to 72 months). Includes a conditional tranche.

ServicesFrameworkEU fundedElectronic submission

EUR 27.1M

Valeur estimée

Localisation

FRZZZ, France

Durée

Feb 2027 - May 2032

Catégorie

Electrical services

Critères d'attribution

Price

Date limite

Expired Jul 26, 2026

LOT-0003

AIGP

Project management services for network construction related to the AIGP agency (large projects engineering agency). Lot is a framework agreement with an estimated value of EUR 6,863,800 and a framework maximum of EUR 8,579,750. Duration: 48 months firm, renewable twice for 12 months each (total up to 72 months). Includes a conditional tranche.

ServicesFrameworkEU fundedElectronic submission

EUR 27.1M

Valeur estimée

Localisation

FRZZZ, France

Durée

Feb 2027 - May 2032

Catégorie

Electrical services

Critères d'attribution

Price

Date limite

Expired Jul 26, 2026

Détails de la procédure

Date de publication
29 Jun 2026
Langues
French

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
445879-2026

Documents (1)

Appels d'offres similaires