Construction of sewage collector for the construction works of Port Polska with possibility of use during airport operation

Centralny Port Komunikacyjny sp. z o.o.·Warszawa, Poland·Expired · Jul 17, 2026·Open·Works
Structured notice only
Titre original de l'avis

Poland – Construction work for water and sewage pipelines – Budowa kolektora ściekowego na czas realizacji robót budowlanych Portu Polska wraz z możliwością wykorzystania na etapie eksploatacji lotniska

45/100

Score d'opportunité

Needs reviewHigh complexity
WorksExpired
Pourquoi ce score ?

Opportunité

45 / 100

Complexité

80 / 100

Facteurs de risque

No estimated value or budget provided. Bidders cannot gauge contract magnitude or financial risk.

100% price criterion may lead to a race to the bottom, reducing profitability.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 1 lot
  • Duration 4347 DAY
  • Preparation of multi-branch detailed designs (Projekty Wykonawcze) based on provided building designs.
  • Preparation of Technical Specifications for Execution and Acceptance of Construction Works (STWiORB).
Afficher le résumé complet

This tender, issued by Centralny Port Komunikacyjny sp. z o.o., is for the construction of a sewage collector for the Port Polska (Central Communication Port) project in Poland. The scope includes preparation of detailed design, construction, obtaining occupancy permit, and maintenance/operation during the construction period and possibly beyond (via optional tasks). The procedure is open, with electronic submission required. Only one lot is defined, with a 100% price award criterion. The estimated value is not disclosed, and the tender duration is approximately 11.9 years (4347 days). There are inconsistencies in EU funding flags and notice changes, and key procurement documents (e.g., detailed specifications, contract terms) were not analyzed.

Risques

No estimated value or budget provided. Bidders cannot gauge contract magnitude or financial risk.

100% price criterion may lead to a race to the bottom, reducing profitability.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Bid bond (wadium) of 250,000 PLN required.

Administrative

  • Confidential documents must be accessed by signing a confidentiality agreement before the submission deadline.
  • Electronic submission mandatory via the procurement platform.

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price – 100% weight100%

Acheteur

Localisation

Warszawa, POL

Profil acheteur

Ouvrir le profil

Identifiant

PL 7010894497

Activité

General public services

Lots (1)

LOT-0001

Construction of sewage collector for the construction works of Port Polska with possibility of use during airport operation

Design, construction, and maintenance of a sewage collector and pumping station to serve the CPK airport construction site, with potential continued use during airport operation. Includes preparation of detailed design, supervision, construction, obtaining permit, and operating/maintaining the system.

WorksEU fundedElectronic submission

Localisation

PL913, Poland

Durée

4347 DAY

Catégorie

Construction work for water

Critères d'attribution

Price

Date limite

Expired Jul 17, 2026

Détails de la procédure

Date de publication
28 Jun 2026
Langues
Polish

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
443246-2026

Documents (1)