Tenderwize
Retour à la recherche

Executive design and subsequent realization of works for the extension of common infrastructures for the development of the New Free Port of Trieste – File A

Autorità di Sistema Portuale del Mare Adriatico Orientale – Porti di Trieste e Monfalcone·trieste, Italy·EUR 169.9M·Expired · Jul 30, 2026·Open·Works
High valueStructured notice only
Titre original de l'avis

Italy – Building construction work – Servizio di progettazione esecutiva e successiva realizzazione dei lavori di cui al progetto AdSP MAO n. 1951 “Estensione delle infrastrutture comuni per lo sviluppo del Punto Franco Nuovo del porto di Trieste” – Fascicolo A

55/100

Score d'opportunité

Needs reviewHigh complexity
WorksExpired
Pourquoi ce score ?

Opportunité

55 / 100

Complexité

70 / 100

Facteurs de risque

Submission deadline is only about one month from notice publication, which may be insufficient for preparing a complex...

Key eligibility, award criteria, and technical requirements are referenced only to tender documents not analyzed.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • EUR 169.9M estimated value
  • Works contract
  • 1 lot
  • Duration 20 MONTH
  • Executive design of common infrastructure works for the New Free Port of Trieste
  • Subsequent realization (construction) of the designed works
Afficher le résumé complet

Open procedure tender for executive design and subsequent realization of works (design-build) for the extension of common infrastructures for the development of the New Free Port of Trieste, Italy. Single lot with estimated value €169,943,989.72, duration 20 months, EU-funded. Award based on quality criteria. Submission deadline is 2026-07-30 at 10:00 UTC (note: XML notice indicates 12:00 CEST). Electronic submission required via https://eappalti.regione.fvg.it/. Tender documents (disciplinare di gara) are referenced but not analyzed.

Risques

Submission deadline is only about one month from notice publication, which may be insufficient for preparing a complex...

Key eligibility, award criteria, and technical requirements are referenced only to tender documents not analyzed.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Executive design and construction of port infrastructure
  • EU-funded project (CUP C94E21000460001)
  • Duration: 20 months

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Quality criterion: refer to tender documents for details.

Acheteur

Localisation

trieste, ITA

Profil acheteur

Ouvrir le profil

Identifiant

00050540327

Activité

General public services

Lots (1)

LOT-0001

Executive design and subsequent realization of works for the extension of common infrastructures for the development of the New Free Port of Trieste – File A

Design and construction of common infrastructure works for the New Free Port of Trieste, including optional works for railway armament and TE, SSE, RED, IS, TLC installations.

WorksEU fundedElectronic submission

EUR 169.9M

Valeur estimée

Localisation

Trieste, Italy

Durée

20 MONTH

Catégorie

Works for complete or part construction

Critères d'attribution

Quality

Date limite

Expired Jul 30, 2026

Détails de la procédure

Date de publication
28 Jun 2026
Langues
Italian

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
442152-2026

Documents (1)

Appels d'offres similaires