PEACEPLUS - Access to the Hills
Titre original de l'avis
United Kingdom – Works for complete or part construction and civil engineering work – PEACEPLUS - Access to the Hills
Score d'opportunité
Pourquoi ce score ?
Opportunité
60 / 100
Complexité
55 / 100
Facteurs de risque
Works in environmentally sensitive upland landscape may require additional permits, environmental assessments, and care...
Landownership constraints and existing public access routes may complicate construction logistics and require stakehold...
Restricted procedure — pre-qualification required
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Aperçu
Moderate opportunityFaits clés
- GBP 625k estimated value
- Works contract
- 1 lot
- Construction and improvement of approximately 8km of walking routes (upgrades and new sections)
- Installation of field gates, pedestrian access controls, steps, and wayfinding signage
Afficher le résumé complet
This tender by Belfast City Council seeks a contractor for the Access to the Hills project, a landscape and recreational access infrastructure scheme in the Belfast Hills, Northern Ireland. The works involve constructing/improving approximately 8km of walking routes, including gates, signage, drainage, and ancillary works. The contract is EU-funded (PEACEPLUS) and uses a restricted procedure with electronic submission via eSourcing NI. The estimated value is £625,000. No eligibility criteria or award criteria are explicitly stated in the provided data. The deadline is 24 July 2026, but there is a slight inconsistency between structured data (11:00) and XML notice (12:00). Only the notice was analyzed; no procurement documents were reviewed.
Risques
Works in environmentally sensitive upland landscape may require additional permits, environmental assessments, and care...
Landownership constraints and existing public access routes may complicate construction logistics and require stakehold...
Restricted procedure — pre-qualification required
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Restricted procedure – likely requires expression of interest and pre-qualification
- EU-funded project (PEACEPLUS, ERDF) – may require compliance with EU procurement rules
Administrative
- Electronic submission via eSourcing NI (Ouvrir le portail)
Les exigences peuvent être incomplètes.
Acheteur
Localisation
Belfast, GBR
Profil acheteur
Identifiant
BT2 8DJ
Activité
General public services
Lots (1)
LOT-0001
PEACEPLUS - Access to the Hills
Delivery of the Access to the Hills project: construction and improvement of ~8km walking routes, field gates, pedestrian controls, steps, signage, drainage, and ancillary works in the Belfast Hills between Cave Hill and Black Mountain. Includes sections connecting Fernhill House to Divis, Ligoniel to Divis, and Divis to Cave Hill. Challenges include environmentally sensitive upland landscape, existing public access, landownership constraints, drainage/flood risk, utilities, and public safety.
EUR 725.4k
Valeur estimée
Localisation
Catégorie
Détails des critères
**NOTE this is not an above threshold exercise but is a notice to highlight this tender is live on eSourcing NI** The Contract is for the delivery of the Access to the Hills project, a landscape and recreational access infrastructure scheme located within the Belfast Hills between Cave Hill and Black Mountain in North and West Belfast. The project comprises the construction and improvement of approximately 8km of walking routes, including upgrades to existing paths and the creation of new path sections. Associated works include the installation of field gates, pedestrian access controls, steps, wayfinding signage, drainage infrastructure and other ancillary works required to provide a safe, accessible and connected network of routes. The scheme will improve public access to the Belfast Hills, creating enhanced recreational walking opportunities, strengthening links between local communities and the hills, and encouraging greater enjoyment and understanding of the natural environment. The works are located across a number of routes linking communities to the Belfast Hills between Cave Hill and Black Mountain, including sections connecting Fernhill House to Divis, Ligoniel to Divis and Divis to Cave Hill. The project presents a range of challenges associated with working within an environmentally sensitive upland landscape, interfacing with existing public access routes, landownership constraints, drainage and flood risk considerations, existing utilities and maintaining public safety throughout construction.
Afficher les données TED originales
Description TED originale
**NOTE this is not an above threshold exercise but is a notice to highlight this tender is live on eSourcing NI** The Contract is for the delivery of the Access to the Hills project, a landscape and recreational access infrastructure scheme located within the Belfast Hills between Cave Hill and Black Mountain in North and West Belfast. The project comprises the construction and improvement of approximately 8km of walking routes, including upgrades to existing paths and the creation of new path sections. Associated works include the installation of field gates, pedestrian access controls, steps, wayfinding signage, drainage infrastructure and other ancillary works required to provide a safe, accessible and connected network of routes. The scheme will improve public access to the Belfast Hills, creating enhanced recreational walking opportunities, strengthening links between local communities and the hills, and encouraging greater enjoyment and understanding of the natural environment. The works are located across a number of routes linking communities to the Belfast Hills between Cave Hill and Black Mountain, including sections connecting Fernhill House to Divis, Ligoniel to Divis and Divis to Cave Hill. The project presents a range of challenges associated with working within an environmentally sensitive upland landscape, interfacing with existing public access routes, landownership constraints, drainage and flood risk considerations, existing utilities and maintaining public safety throughout construction.
Détails de la procédure
- Date de publication
- 25 Jun 2026
- Langues
- English
Métadonnées de référence
- Base juridique
- 32014L0024
Identifiants de référence
- ID de l'appel d'offres
- 440827-2026
Documents (1)
Appels d'offres similaires
Poland – Road construction works – Rozbudowa drogi krajowej nr 22 na odcinku Malbork -Królewo
Spain – Works for complete or part construction and civil engineering work – Contratación de la redacción de l proyecto, construcción y explotación en régimen de concesión de un aparcamiento para vehículos pesados en la parcela M2 del Parque Logístico de Valencia, propiedad de la Entidad Valenciana de Vivienda y Suelo.
France – Construction work – P682C-L-X MRS JEAN MARTIN : Appel d'offre sur AVP, conception réalisation de panneaux de façades préfa biosourcés y compris men ext
France – Works for complete or part construction and civil engineering work – Mise en sécurité des Galeries Nobles - Sorbonne 2026
Netherlands – Works for complete or part construction and civil engineering work – Zwembad Ooigraaf
Spain – Site preparation work – CONTRATO DE OBRA DE URBANIZACIÓN
Score d'opportunité
Pourquoi ce score ?
Opportunité
60 / 100
Complexité
55 / 100
Facteurs de risque
Works in environmentally sensitive upland landscape may require additional permits, environmental assessments, and care...
Landownership constraints and existing public access routes may complicate construction logistics and require stakehold...
Restricted procedure — pre-qualification required
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications