Tenderwize
Retour à la recherche

Maintenance of Pressure Equipment at EDF PEI Port Est and TAC

EDF PRODUCTION ELECTRIQUE INSULAIRE SAS·PUTEAUX, France·Expired · Jul 07, 2026·Oth Mult·Services·Framework
Structured notice only
Titre original de l'avis

France – Repair and maintenance services for pumps, valves, taps and metal containers and machinery – Accord cadre pour la Réalisation des maintenances des ESP et des tuyauteries soumis à l’Arrêté Ministériel du 20 novembre 2017 des sites EDF PEI Port Est (DRP) et TAC

40/100

Score d'opportunité

Needs reviewHigh complexity
ServicesFrameworkExpired
Pourquoi ce score ?

Opportunité

40 / 100

Complexité

75 / 100

Facteurs de risque

Only about 12 days between publication (25 June) and deadline (7 July) to prepare and submit a complete candidature wit...

No estimated contract value is provided, making it impossible to gauge project scale or financial commitment required.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Framework procurement
  • Services contract
  • 1 lot
  • Duration 8 YEAR
  • Preventive and corrective maintenance of pressure equipment (ESP) and piping on demand
  • Preparation for regulatory inspections (opening, closing, fitting flanges, etc.)
Afficher le résumé complet

This tender, published by EDF Production Electrique Insulaire SAS, is for a framework agreement for maintenance services of pressure equipment (ESP) and piping subject to the French Ministerial Order of 20 November 2017 at EDF PEI sites Port Est (DRP) and Turbine à Combustion (TAC) in Le Port, Réunion. The framework has an initial duration of 2 years, renewable three times for additional 2-year periods (maximum 8 years). The procedure is a negotiated procedure with competition and prior selection limited to 5 candidates. The deadline for candidatures is 7 July 2026. No estimated value is provided.

Risques

Only about 12 days between publication (25 June) and deadline (7 July) to prepare and submit a complete candidature wit...

No estimated contract value is provided, making it impossible to gauge project scale or financial commitment required.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Framework agreement with initial 2-year term, renewable up to 3 times for 2 years each (max 8 years)
  • Negotiated procedure with competition, limited to 5 candidates selected based on references

Administrative

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price is a criterion; other criteria are detailed in procurement documents.

Acheteur

Localisation

PUTEAUX, FRA

Site web

www.edf.fr

Profil acheteur

Ouvrir le profil

Identifiant

489 967 687

Activité

Electricity-related activities

Lots (1)

LOT-0001

Maintenance of Pressure Equipment at EDF PEI Port Est and TAC

Framework agreement for preventive, corrective, improvement, and regulatory maintenance (including preparation and execution of regulatory controls) of pressure equipment (ESP) and piping on EDF PEI sites, primarily at Port Est (DRP) and to a lesser extent at TAC.

ServicesFrameworkEU fundedElectronic submission

Localisation

LE PORT, France

Durée

Dec 2026

Catégorie

Repair and maintenance services for pumps

Critères d'attribution

Price

Date limite

Expired Jul 07, 2026

Détails de la procédure

Date de publication
25 Jun 2026
Langues
French

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
439939-2026

Documents (1)

Appels d'offres similaires