Tenderwize
Retour à la recherche

Single Lot - Supply and Installation of Urban Furniture on TVM Line

RATP EXPERTISES·Paris, France·Expired · Jul 08, 2026·Neg W Call·Supplies
Structured notice only
Titre original de l'avis

France – Urban furniture – Fourniture et pose de mobilier urbain sur le site propre du TVM

40/100

Score d'opportunité

Needs reviewMedium complexity
SuppliesExpired
Pourquoi ce score ?

Opportunité

40 / 100

Complexité

60 / 100

Facteurs de risque

No estimated contract value is provided. This makes it impossible to assess financial commitment or profitability.

Deadline is only 2 weeks from publication (8 July 2026). Insufficient time to prepare comprehensive bid, especially wit...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Supplies contract
  • 1 lot
  • Duration until Oct 2029
  • Supply and installation of urban furniture on the TVM bus line.
  • Firm tranche: Replacement of 118 bus shelters, removal of 8 existing shelters, replacement of 84 double waste receptacles, integration of passenger information supports.
Afficher le résumé complet

This tender, published by RATP EXPERTISES on behalf of RATP CAP IDF, is for the supply and installation of urban furniture on the TVM bus line in Île-de-France, France. It is a single-lot negotiated procedure with a base scope and three optional tranches. Bidders must submit both a Base Solution and a Mandatory Alternative Solution. The contract is a phased contract with a firm period of 36 months. No estimated value is provided. The deadline for submission is 8 July 2026, 10:00. The tender language is French. Key requirements include replacement of 118 bus shelters, waste bins, and integration of passenger information supports. Only the TED notice was analyzed; procurement documents were not examined.

Risques

No estimated contract value is provided. This makes it impossible to assess financial commitment or profitability.

Deadline is only 2 weeks from publication (8 July 2026). Insufficient time to prepare comprehensive bid, especially wit...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Place of performance: Île-de-France (FR101), France.

Administrative

  • Submission of both Base Solution and Mandatory Alternative Solution; incomplete offers (only one) will be rejected.
  • Contract duration: 36 months from signature.

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price (weight not specified); other criteria in procurement documents.

Acheteur

Localisation

Paris, FRA

Site web

www.ratp.fr

Profil acheteur

Ouvrir le profil

Identifiant

95291091700014

Activité

Urban railway, tramway, trolleybus or bus services

Lots (1)

LOT-0001

Single Lot - Supply and Installation of Urban Furniture on TVM Line

Single lot covering the replacement of urban furniture on the TVM bus line (firm tranche: 118 bus shelters, 84 double waste receptacles, removal of existing shelters; optional tranches: 38 shelters on line 393, adhesive renewal, signage). Bidders must submit both Base and Mandatory Alternative Solutions. The contract is for 36 months.

SuppliesElectronic submissionSME suitable

Localisation

FR101, France

Durée

Oct 2026 - Oct 2029

Catégorie

Urban furniture

Critères d'attribution

Price

Date limite

Expired Jul 08, 2026

Détails de la procédure

Date de publication
24 Jun 2026
Langues
French

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
438450-2026

Documents (1)

Appels d'offres similaires