Consultance en ingénierie pour la protection contre les inondations à Nenagh
Titre original de l'avis
Ireland – Engineering services – Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
Score d'opportunité
Pourquoi ce score ?
Opportunité
60 / 100
Complexité
70 / 100
Facteurs de risque
Award criteria, selection criteria, and detailed requirements are not available in the notice. Without analyzing procur...
Structured data indicates EU-funded, but XML notice states 'no-eu-funds'. This could affect compliance obligations or p...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Informations clés
- Pouvoir adjudicateur
- Tipperary County Council
- Pays
- Irlande
- CPV
- 71300000 - Engineering services +8 autres
- Date limite
- Aug 05, 2026
- Valeur estimée
- EUR 3M
Aperçu
Moderate opportunityFaits clés
- EUR 3M estimated value
- Services contract
- 1 lot
- Duration 108 MONTH
- Identification and design of a flood relief scheme for Nenagh
- Submission for planning consent
Afficher le résumé complet
Tipperary County Council is procuring engineering and environmental consultancy services for the Nenagh Flood Relief Scheme. The contract covers identification, design, planning consent, detailed design, and construction oversight of a flood relief scheme. Estimated value €3M, duration 108 months. Open procedure, deadline 5 August 2026. Award criteria details are not provided. EU funding status is inconsistent between structured data (EU-funded) and XML notice (no EU funds). Only the TED notice was analyzed; procurement documents were not examined.
Risques
Award criteria, selection criteria, and detailed requirements are not available in the notice. Without analyzing procur...
Structured data indicates EU-funded, but XML notice states 'no-eu-funds'. This could affect compliance obligations or p...
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Consultant must handle both engineering and environmental elements
- Project duration of 108 months
Administrative
- Electronic submission required
Les exigences peuvent être incomplètes.
Acheteur
Localisation
Clonmel, Nenagh, IRL
Site web
Profil acheteur
Identifiant
32452
Activité
General public services
Lots (1)
LOT-0001
Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
Single lot covering all engineering and environmental consultancy for the flood relief scheme, from initial studies through design, planning, and construction supervision.
EUR 3M
Valeur estimée
Localisation
Durée
Catégorie
Date limite
Détails des critères
Background - The OPW, working in partnership with Tipperary County Council and other Local Authorities, commissioned and have completed the Shannon Upper and Lower River Basin Catchment Flood Risk Assessment and Management (CFRAM) Study. The Shannon Upper and Lower River Basin (‘Shannon’) CFRAM Study Area included Nenagh as an Area for Further Assessment (AFA) and identified that a flood relief scheme for the community would be appropriate to be further developed for implementation. To advance and implement a flood relief scheme for Nenagh, Tipperary County Council, supported by a Steering Group, intends to commission a Contract to develop and assist with the implementation of the Scheme. This Contract will be procured using one Consulting firm (hereafter referred to as “the Consultant”) to progress both the Engineering and Environmental elements of the Tender Specification. Project Objectives - The objective of this project is the identification, design and submission for planning consent of a Flood Relief Scheme, that is technically, socially, environmentally and economically acceptable, to alleviate the risk of flooding in the community of Nenagh to a determined Standard of Protection, to complete the detailed design, and to procure, manage and oversee the construction of that Scheme. The tasks that are to be carried out by the Consultant to fulfil this objective are described in detail within the Tender Specification.
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Description TED originale
Background - The OPW, working in partnership with Tipperary County Council and other Local Authorities, commissioned and have completed the Shannon Upper and Lower River Basin Catchment Flood Risk Assessment and Management (CFRAM) Study. The Shannon Upper and Lower River Basin (‘Shannon’) CFRAM Study Area included Nenagh as an Area for Further Assessment (AFA) and identified that a flood relief scheme for the community would be appropriate to be further developed for implementation. To advance and implement a flood relief scheme for Nenagh, Tipperary County Council, supported by a Steering Group, intends to commission a Contract to develop and assist with the implementation of the Scheme. This Contract will be procured using one Consulting firm (hereafter referred to as “the Consultant”) to progress both the Engineering and Environmental elements of the Tender Specification. Project Objectives - The objective of this project is the identification, design and submission for planning consent of a Flood Relief Scheme, that is technically, socially, environmentally and economically acceptable, to alleviate the risk of flooding in the community of Nenagh to a determined Standard of Protection, to complete the detailed design, and to procure, manage and oversee the construction of that Scheme. The tasks that are to be carried out by the Consultant to fulfil this objective are described in detail within the Tender Specification.
Détails de la procédure
- Date de publication
- 24 Jun 2026
- Langues
- English
Métadonnées de référence
- Base juridique
- 32014L0024
Identifiants de référence
- ID de l'appel d'offres
- 438414-2026
Documents (2)
Appels d'offres similaires
Poland – Environmental engineering consultancy services – Ocena wpływu budowli poprzecznych na ciągłość biologiczną i cele środowiskowe JCWP
Finland – Environmental engineering consultancy services – Vastuullisuuskonsultointi
Poland – Research services – KPN/26/2026 „Porosty torfowisk karkonoskich”
Germany – Engineering design services for the construction of civil engineering works – Planungsleistung Technische Ausrüstung für Hermann-Schafft-Schule in Homberg, LWV Hessen
Ireland – Engineering design services for the construction of civil engineering works – Dunsallagh/Killernan GWS Civil Engineering works to upgrade infrastructure
Poland – Environmental engineering consultancy services – Zlecenie aktualizacji opracowania dokumentacji PZO wraz z wykonaniem ekspertyz przyrodniczych dla obszaru Natura 2000 Torfowiska Orawsko-Nowotarskie PLC120003 (cz. 3 - ornitologia)
Score d'opportunité
Pourquoi ce score ?
Opportunité
60 / 100
Complexité
70 / 100
Facteurs de risque
Award criteria, selection criteria, and detailed requirements are not available in the notice. Without analyzing procur...
Structured data indicates EU-funded, but XML notice states 'no-eu-funds'. This could affect compliance obligations or p...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications