Tenderwize
Retour à la recherche

Supply of 40 Low-Floor Air-Conditioned Articulated Trams

СТОЛИЧЕН ЕЛЕКТРОТРАНСПОРТ ЕАД·гр. София, Bulgaria·EUR 102.3M·Expired · Aug 10, 2026·Open·Supplies
High valueStructured notice only
Titre original de l'avis

Bulgaria – Railway and tramway locomotives and rolling stock and associated parts – ДОСТАВКА НА 40 БРОЯ НОВИ НИСКОПОДОВИ КЛИМАТИЗИРАНИ СЪЧЛЕНЕНИ ТРАМВАЙНИ МОТРИСИ ЗА МЕЖДУРЕЛСИЕ 1009 mm

60/100

Score d'opportunité

Needs reviewHigh complexity
SuppliesExpired
Pourquoi ce score ?

Opportunité

60 / 100

Complexité

75 / 100

Facteurs de risque

Turnover requirement equal to full estimated value may be overly restrictive and could be challenged.

Extensive technical criteria with subjective scores (e.g., rotating bogies definition, corrosion protection method eval...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Informations clés

Pouvoir adjudicateur
СТОЛИЧЕН ЕЛЕКТРОТРАНСПОРТ ЕАД
Pays
Bulgarie
CPV
34600000 - Railway and tramway locomotives and rolling stock and associated parts +1 autres
Date limite
Aug 10, 2026
Valeur estimée
EUR 102.3M

Aperçu

Moderate opportunity

Faits clés

  • EUR 102.3M estimated value
  • Supplies contract
  • 1 lot
  • Duration 36 MONTH
  • Supply of 40 low-floor air-conditioned articulated trams for 1009 mm gauge
  • Training of buyer's staff for operation, maintenance, diagnostics, and repair
Afficher le résumé complet

The tender by Stolichen Elektrotransport EAD (Sofia) for the supply of 40 new low-floor air-conditioned articulated trams for 1009 mm gauge, including training, diagnostic equipment, special tools, and documentation. Single lot, open procedure, EU-funded (though XML indicates no EU funds? inconsistency noted), estimated value EUR 102,258,376.24. Performance in Sofia, Bulgaria. Deadline 2026-08-10. Award criteria: Price 40%, Technical quality 40%, Delivery time 10%, Warranty conditions 10%. Minimal turnover requirement equals estimated value in rail rolling stock supply.

Risques

Turnover requirement equal to full estimated value may be overly restrictive and could be challenged.

Extensive technical criteria with subjective scores (e.g., rotating bogies definition, corrosion protection method eval...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Trams must be low-floor, air-conditioned, articulated, for 1009 mm gauge
  • Delivery in 36 months maximum, 12 months minimum
  • Offer must include price, technical specification, delivery time, and warranty conditions

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price – weight 40 points — 40%Technical quality – weight 40 points — 40%Delivery time – weight 10 points — 10%Warranty conditions – weight 10 points — 10%

Acheteur

Localisation

гр. София, BGR

Profil acheteur

Ouvrir le profil

Identifiant

121683785

Activité

Urban railway, tramway, trolleybus or bus services

Lots (1)

LOT-0001

Supply of 40 Low-Floor Air-Conditioned Articulated Trams

Delivery of 40 new low-floor air-conditioned articulated trams for 1009 mm gauge, training of buyer's personnel for operation and maintenance, supply of diagnostic equipment (Appendix 3), special tools (Appendix 4), and documentation.

SuppliesEU fundedElectronic submission

EUR 102.3M

Valeur estimée

Localisation

София, Bulgaria

Durée

Oct 2026

Catégorie

Railway

Critères d'attribution

Best price-quality ratio

Date limite

Expired Aug 10, 2026

Détails de la procédure

Date de publication
24 Jun 2026
Langues
Bulgarian

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
435717-2026

Documents (1)

Appels d'offres similaires