Tenderwize
Retour à la recherche

Construction of fire observation tower in the Celestynów Forest District

Skarb Państwa Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo Celestynów·Celestynów, Poland·Expired · Jul 27, 2026·Open·Works
Structured notice only
Titre original de l'avis

Poland – Construction work – Budowa wieży obserwacyjnej przeciwpożarowej na terenie Leśnictwa Celestynów

50/100

Score d'opportunité

Needs reviewMedium complexity
WorksExpired
Pourquoi ce score ?

Opportunité

50 / 100

Complexité

65 / 100

Facteurs de risque

No estimated value is provided. Bidders cannot assess the scale or budget alignment.

The submission deadline is 33 days from publication; the buyer shortened it by 5 days, increasing time pressure.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 1 lot
  • Duration 120 DAY
  • Demolition of an existing 35.58m high fire tower with careful removal and disposal of materials.
  • Site preparation including scrub removal and groundwork for new tower foundation.
Afficher le résumé complet

This tender involves the demolition of an existing 35.58m fire tower and the construction of a new 44.8m steel lattice observation tower in Celestynów, Poland. The project is funded under the EU FEnIKS 2021-2027 program and follows an open procedure with a reverse evaluation. The estimated value is not disclosed. The deadline for submission is 27 July 2026 at 07:00 UTC. The contract duration is 120 days, with site work starting no earlier than 1 October 2026. The buyer requires a bid bond of 5,000 PLN and a performance bond of 5% of the contract price. The award criteria are 60% price and 40% warranty extension (up to 7 years).

Risques

No estimated value is provided. Bidders cannot assess the scale or budget alignment.

The submission deadline is 33 days from publication; the buyer shortened it by 5 days, increasing time pressure.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Performance bond of 5% of the total contract price required.

Administrative

  • Contract performance period: 120 days from contract signature, but site work cannot start before 1 October 2026.
  • Mandatory bid bond of 5,000 PLN (approx. €1,150) to be submitted before deadline.

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price criterion with 60% weighting.60%Warranty extension criterion with 40% weighting, up to 7 years.40%

Acheteur

Localisation

Celestynów, POL

Profil acheteur

Ouvrir le profil

Identifiant

NIP: 532-010-14-61

Activité

Economic affairs

Lots (1)

LOT-0001

Construction of fire observation tower in the Celestynów Forest District

Demolition of existing 35.58m square-section fire tower and construction of a new 44.8m triangular-section steel lattice tower with a service platform at 40.6m, including site preparation, concrete works, steel structure assembly, and related works. Detailed scope in design documentation.

WorksEU fundedElectronic submissionSME suitable

Localisation

Celestynów, Poland

Durée

120 DAY

Catégorie

Construction work

Critères d'attribution

Price

Date limite

Expired Jul 27, 2026

Détails de la procédure

Date de publication
24 Jun 2026
Langues
Polish

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
435225-2026

Documents (1)

Appels d'offres similaires