Tunnel and Rock Protection Framework Agreement 2026-2028

Statens vegvesen·Moss, Norway·NOK 300M | EUR 26.9M·Expired · Aug 14, 2026·Open·Works·Framework
High value
Titre original de l'avis

Norway – Construction work – DoV Framework agreement Tunnel and rock protection 2026-2028

0/100

Score d'opportunité

High riskLow complexity
WorksFrameworkExpired
Pourquoi ce score ?

Opportunité

0 / 100

Complexité

0 / 100

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Critères d'attribution

Lot 1

Lowest price100%Justification for the use of climate and environmental requirements in the requirement specifications

Lot 2

Lowest price100%Justification for the use of climate and environmental requirements in the requirement specifications

Acheteur

Localisation

Moss, NOR

Profil acheteur

Ouvrir le profil

Identifiant

971032081

Activité

General public services

Lots (2)

LOT-0001

DoV Framework agreement tunnel and rock protection 2026-2028 MR: Møre og Romsdal.

MR Møre og Romsdal

WorksFrameworkEU fundedElectronic submission

EUR 26.9M

Valeur estimée

Localisation

NO0A3, Norway

Durée

2 YEAR

Catégorie

Construction work

Critères d'attribution

Price

LOT-0002

DoV Framework agreement Tunnel and rock protection 2026-2028 TR: Trøndelag

The Norwegian Public Roads Administration Operations and Maintenance invites tenderers to a competition for the following contract work: Framework agreement for tunnel and rock protection for Trøndelag, Møre og Romsdal. The contract includes cleaning and bolting protection, establishing new and improving existing water and frost protection in tunnels, clearing and bolt protection in cuttings, establishing different types of meshes (ice nets, erosion network etc.), improvements and establishment of new security measures in the open air on European and national roads. in Trøndelag, Møre og Romsdal. The measures will vary in extent. Outside of general processes, a couple of concrete projects are described to be carried out: TR01: E6 Kvam – clearing and work protection cutting. Modification of the existing network TR02: E6 Cleansed - clearing and work securing cutting. Assembly of an ice network. TR03: E39 Søvassdalen - clearing and work securing cutting. Assembly of an ice network. MR01:E39 Brusdalen – clearing and work securing cutting. MR03: E136 Sørnes tunnel – Rensk and securing, establishment of a new water-frost protection vault. Consideration shall be given to set timetables for public transport. Routines must be established. for emergency emergency services. All traffic deviations/driving vehicles in tunnels shall be carried out for work. passing must be clarified by the traffic conductor with work teams in the tunnel before emergency services are released. through. There will be a lot of focus on the contract work notification as the work is ongoing on the existing road network. The location of the traffic conductor shall always be risk assessed in the contractor ́s work warning plan. The contracting authority would like parallel framework agreements with up to 3 contractors per area, based on which tender is best in accordance with the award criteria.

WorksFrameworkEU fundedElectronic submission

EUR 26.9M

Valeur estimée

Localisation

NO060, Norway

Durée

2 YEAR

Catégorie

Construction work

Critères d'attribution

Price

Détails de la procédure

Date de publication
24 Jun 2026
Langues
English, Norwegian