Replacement/New construction of railway bridge Gotha - Gotha Ost, Salzgitterstraße
Titre original de l'avis
Germany – Construction work for iron bridges – Strecke 6296, Ersatzneubau/Erneuerung EÜ Gotha - Gotha Ost, Salzgitterstraße
Score d'opportunité
Pourquoi ce score ?
Opportunité
40 / 100
Complexité
75 / 100
Facteurs de risque
No estimated value or budget provided. Bidders cannot gauge project size or cost expectations. This may indicate a non-...
The notice states that no financial clearance has been obtained for the essential works. The contract may be cancelled...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Informations clés
- Pouvoir adjudicateur
- DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)
- Pays
- Allemagne
- CPV
- 45221114 - Construction work for iron bridges
- Date limite
- Jul 20, 2026
Aperçu
Moderate opportunityFaits clés
- Works contract
- 1 lot
- Duration until Jun 2028
- Demolition of existing railway bridge (structural volume 742 m3)
- Construction of reinforced concrete half-frame in secondary position
Afficher le résumé complet
Replacement/new construction of a railway bridge over a federal road (Bundesstraße) in Gotha, Germany. The project includes demolition of existing structure, construction of a reinforced concrete half-frame, use of low-emission concrete, earthworks, track work, road work, and associated services. The tender is an open procedure under the German SektVO (sector rules).
Risques
No estimated value or budget provided. Bidders cannot gauge project size or cost expectations. This may indicate a non-...
The notice states that no financial clearance has been obtained for the essential works. The contract may be cancelled...
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Open procedure (no pre-qualification required initially, but DB pre-qualification may be necessary if stated in lot-specific info)
Administrative
- Electronic submission required via DB bieterportal
- Tenders must include a declaration of independence from engineering firms commissioned by the contracting authority
Les exigences peuvent être incomplètes.
Critères d'attribution
Lot 1
Acheteur
Localisation
Frankfurt Main, DEU
Identifiant
fb197f94-7578-4673-8a57-4642ae120532
Activité
Railway services
Lots (1)
LOT-0001
Replacement/New construction of railway bridge Gotha - Gotha Ost, Salzgitterstraße
Demolition of existing bridge (742 m3), construction of reinforced concrete half-frame in secondary position, insertion of the structure, use of 1,016 m3 low-emission concrete, 270 m2 shoring works, 6,900 m3 earth excavation (2,000 m3 reused), 4,700 m3 backfill with supplied material, track works over 50 m, road works over 75 m, temporary dewatering of surface/groundwater, and related LST, TK, KT works.
Localisation
Durée
Catégorie
Critères d'attribution
Date limite
Détails des critères
Preis
Note sur la valeur
Afficher les données TED originales
Titre original du lot
Strecke 6296, Ersatzneubau/Erneuerung EÜ Gotha - Gotha Ost, Salzgitterstraße
Description TED originale
Strecke 6296, Ersatzneubau/Erneuerung EÜ Gotha - Gotha Ost, Salzgitterstraße Ersatzneubau Eisenbahnüberführung über Bundesstraße in Ortslage; Überführung eingleisiger, nicht elektrifizierter Strecke; - Abbruch Bestandsbauwerk 742 m3, - Ausführung aus Stahlbetonhalbrahmen in Nebenlage, - Einfahren des Bauwerks; - 1.016 m3 emissionsreduzierter Beton - 270 m2 Verbauarbeiten; - 6.900 m3 Erdaushub, davon 2.000 m3 Wiedereinbau - 4.700 m3 Einbau gelieferter Erdstoff; - Gleisarbeiten über 50 m; - Straßenarbeiten über 75 m, - bauzeitliche Wasserhaltung Oberflächen/Schichtenwasser, - Zusammenhangsleistungen LST, TK, KT
Détails de la procédure
- Date de publication
- 24 Jun 2026
- Langues
- German
Métadonnées de référence
- Base juridique
- 32014L0025
Identifiants de référence
- ID de l'appel d'offres
- 433095-2026
Documents (1)
Score d'opportunité
Pourquoi ce score ?
Opportunité
40 / 100
Complexité
75 / 100
Facteurs de risque
No estimated value or budget provided. Bidders cannot gauge project size or cost expectations. This may indicate a non-...
The notice states that no financial clearance has been obtained for the essential works. The contract may be cancelled...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications