Tenderwize
Retour à la recherche

Design and Construction of Road Underpass at DJ 172 Intersection with CFR Line and DN17 in Beclean

ORASUL BECLEAN·Beclean, Romania·RON 32M | EUR 6.1M·Expired · Jul 28, 2026·Open·Works
High valueStructured notice only
Titre original de l'avis

Romania – Construction work for tunnels, shafts and subways – Servicii de proiectare și execuție a lucrărilor pentru REALIZARE PASAJ RUTIER DJ 172 INTERSECȚIE CU LINIA CFR ȘI DN17 ÎN LOCALITATEA BECLEAN, JUDEȚUL BISTRIȚA NĂSĂUD

60/100

Score d'opportunité

Needs reviewHigh complexity
WorksExpired
Pourquoi ce score ?

Opportunité

60 / 100

Complexité

80 / 100

Facteurs de risque

If proposed experts have insufficient experience (fewer projects), points are low or offer rejected.

Missing or incorrect DUAE or beneficial owner declarations may lead to rejection.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Informations clés

Pouvoir adjudicateur
ORASUL BECLEAN
Pays
Roumanie
CPV
45221200 - Construction work for tunnels, shafts and subways +5 autres
Date limite
Jul 28, 2026
Valeur estimée
RON 32M (approx. EUR 6.1M)

Aperçu

Moderate opportunity

Faits clés

  • RON 32M estimated value
  • Works contract
  • 1 lot
  • Duration 18 MONTH
  • Demolition of existing structures and road surfaces
  • Stormwater collection and drainage works
Afficher le résumé complet

Design and construction of a road underpass at the intersection of DJ 172 with the CFR railway line and DN17 in Beclean, Bistrița-Năsăud County, Romania. The project is co-financed by the EU (Regional Program Nord-Vest 2021-2027). The contract includes both design (6 months) and execution (12 months) phases, with a total estimated value of RON 32,022,103.40 (approx. EUR 6.1 million). Award criteria are 40% price and 60% quality (expert experience and extended warranty). Submission deadline: 28 July 2026, 12:00 (local time). Only the notice and an XML extract were analyzed; full procurement documents were not reviewed.

Risques

If proposed experts have insufficient experience (fewer projects), points are low or offer rejected.

Missing or incorrect DUAE or beneficial owner declarations may lead to rejection.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Contract duration: 18 months total (6 months design + 12 months execution)
  • Minimum warranty period: 3 years; extended warranty up to 60 months for additional points
  • EU-funded (Regional Program Nord-Vest 2021-2027) – compliance with EU procurement rules

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price (40 points): Lowest tender price receives maximum score; others scored proportionally. — 40%Experience of Design Engineer 1 (10 points): Scored on number of relevant projects. — 10%Experience of Design Engineer 2 (10 points): Scored on number of relevant projects. — 10%Experience of Design Engineer 3 (10 points): Scored on number of relevant projects. — 10%Experience of Project Manager (10 points): Scored on number of relevant projects. — 10%Experience of Environmental Management Expert (10 points): Scored on number of relevant projects. — 10%Extended warranty period (10 points): Additional warranty beyond the mandatory 36 months, up to 60 months, scored proportionally. — 10%

Acheteur

Localisation

Beclean, ROU

Profil acheteur

Ouvrir le profil

Identifiant

4548821

Activité

General public services

Lots (1)

LOT-0000

Design and Construction of Road Underpass at DJ 172 Intersection with CFR Line and DN17 in Beclean

Single lot covering all design (preliminary, technical, permits, assistance) and construction works for a new underground passage beneath railway lines CF 416 and CF 418, including demolition, drainage, utility relocation, road construction, public lighting, traffic monitoring, safety measures, environmental restoration, and site organization. Duration: 18 months (6 months design + 12 months execution). Minimum warranty: 3 years; optional extended warranty up to 60 months for additional points.

WorksEU fundedElectronic submission

EUR 6.1M

Valeur estimée

Localisation

RO112, Romania

Durée

18 MONTH

Catégorie

Construction work for tunnels

Critères d'attribution

Price

Détails de la procédure

Date de publication
24 Jun 2026
Langues
Romanian

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
432634-2026

Documents (2)

Appels d'offres similaires