Tenderwize
Retour à la recherche

Construction of DN400 gas pipeline Mory-Reguły and adaptation for pigging of DN300/DN400 SG Mory-Gassy

Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A.·Warszawa, Poland·Expired · Jul 15, 2026·Open·Works
Titre original de l'avis

Poland – Construction work for gas pipelines – Budowa gazociągu DN400 MOP 8,4 MPa relacji Mory-Reguły i przystosowanie do tłokowania gazociągu DN300/DN400 SG Mory-Gassy

40/100

Score d'opportunité

Needs reviewHigh complexity
WorksExpired
Pourquoi ce score ?

Opportunité

40 / 100

Complexité

70 / 100

Facteurs de risque

Strict financial criteria (minimum credit line of 4M PLN, average revenue 12.5M PLN, liquidity ratio ≥1.1) may disquali...

Specific experience requirement for pipeline ≥4km, ≥6.3MPa, ≥DN400, steel L415 may be difficult to meet for less experi...

No procurement documents available

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 1 lot
  • Duration until Oct 2028
  • Construction of a gas pipeline DN400 with maximum operating pressure (MOP) of 8.4 MPa along the Mory-Reguły route.
  • Adaptation of the existing DN300/DN400 gas pipeline SG Mory-Gassy for pigging operations.
Afficher le résumé complet

Tender by GAZ-SYSTEM S.A. for construction of a high-pressure gas pipeline (DN400, MOP 8.4 MPa) from Mory to Reguły, and adaptation of existing pipeline for pigging. Single lot, open procedure, price-only award. Estimated contract value not disclosed. Strict financial and technical eligibility criteria including minimum 4M PLN credit line, 12.5M PLN average revenue, and specific pipeline construction experience. Bid bond: 250,000 PLN. Deadline: 2026-07-15 10:00 CEST.

Risques

Strict financial criteria (minimum credit line of 4M PLN, average revenue 12.5M PLN, liquidity ratio ≥1.1) may disquali...

Specific experience requirement for pipeline ≥4km, ≥6.3MPa, ≥DN400, steel L415 may be difficult to meet for less experi...

No procurement documents available

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Liquidity ratio (current assets / short-term liabilities) ≥ 1.10, or alternatively EBITDA > 0 and net debt/EBITDA ≤ 3.80.

Eligibility

  • Financial standing: minimum 4,000,000 PLN credit line or own funds (not summable from different institutions for single bidder, but consortium members can combine).
  • Average annual revenue of at least 12,500,000 PLN over last three fiscal years.

Critères d'attribution

Lot 1

Price only: 100% weighting on total gross price.100%

Acheteur

Localisation

Warszawa, POL

Identifiant

527-243-20-41

Activité

Production, transport or distribution of gas or heat

Lots (1)

LOT-0001

Construction of DN400 gas pipeline Mory-Reguły and adaptation for pigging of DN300/DN400 SG Mory-Gassy

Construction of a DN400 gas pipeline (MOP 8.4 MPa) and adaptation of existing pipeline for pigging. Requires specific technical expertise in high-pressure gas pipeline construction.

WorksElectronic submission

Localisation

PL911, Poland

Durée

Sep 2026 - Oct 2028

Catégorie

Construction work for gas pipelines

Critères d'attribution

Price

Date limite

Expired Jul 15, 2026

Détails de la procédure

Date de publication
24 Jun 2026
Langues
Polish

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
432328-2026

Documents (1)

Appels d'offres similaires