Supply of BESS System Components

ENEA Nowa Energia sp. z o.o.·Radom, Poland·Expired · Jul 27, 2026·Open·Supplies
Structured notice only
Titre original de l'avis

Poland – Uninterruptible power supplies – Przedmiot zamówienia obejmuje dostawę (bez montażu i uruchomienia) komponentów systemu magazynowania energii elektrycznej typu BESS

55/100

Score d'opportunité

Needs reviewMedium complexity
SuppliesExpired
Pourquoi ce score ?

Opportunité

55 / 100

Complexité

65 / 100

Facteurs de risque

No estimated value is provided; potential bidders cannot assess the contract's financial scale or budget accordingly.

The right to change locations without limitation within the specified voivodeships could affect logistics and costs.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Supplies contract
  • 1 lot
  • Duration 36 MONTH
  • Supply of BESS components (batteries, inverters, transformers, etc.) without installation
  • Participation in commissioning of the BESS system
Afficher le résumé complet

This tender, issued by ENEA Nowa Energia sp. z o.o. (lead buyer) jointly with Enea Ciepło sp. z o.o., seeks suppliers for the delivery of Battery Energy Storage System (BESS) components (without installation, but with participation in commissioning). The contract covers a guaranteed minimum of 600 MWh usable capacity within 24 months, with an option for an additional 240 MWh, totaling up to 840 MWh. The contract duration is 36 months. Delivery locations span multiple voivodeships in Poland (Lubuskie, Wielkopolskie, Zachodniopomorskie, Kujawsko-Pomorskie, and Białystok). The procedure is open, conducted in Polish, with an EU funding flag (inconsistency: XML indicates no EU funds). Estimated value is not disclosed. The award is based 85% on price and 15% on quality criteria (cycle life and efficiency). A high bid bond of 4,900,000 PLN is required.

Risques

No estimated value is provided; potential bidders cannot assess the contract's financial scale or budget accordingly.

The right to change locations without limitation within the specified voivodeships could affect logistics and costs.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Delivery of new, complete, factory-new equipment ready for assembly and commissioning by the buyer or another contractor
  • Contract duration: 36 months from signing
  • Performance in accordance with the delivery schedule (Annex 1d)

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price: 85% weight85%Cycle life at 65% SoH: 5% weight5%Efficiency: 10% weight10%

Acheteur

Localisation

Radom, POL

Profil acheteur

Ouvrir le profil

Identifiant

384813168

Activité

Electricity-related activities

Lots (1)

LOT-0001

Supply of BESS System Components

Delivery of BESS components (batteries, inverters, transformers, etc.) without installation, with mandatory participation in commissioning. The scope includes a guaranteed 600 MWh with an option for an additional 240 MWh. The contract duration is 36 months. Performance locations: multiple counties in Lubuskie, Wielkopolskie, Zachodniopomorskie, Kujawsko-Pomorskie, and Białystok. Two separate contracts will be signed: one with ENEA Nowa Energia and one with Enea Ciepło.

SuppliesEU fundedElectronic submissionSME suitable

Localisation

Poland

Durée

36 MONTH

Catégorie

Uninterruptible power supplies

Critères d'attribution

Price

Date limite

Expired Jul 27, 2026

Détails de la procédure

Date de publication
23 Jun 2026
Langues
Polish

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
430805-2026