Tenderwize
Retour à la recherche

Construction Management Services - Northern Line PK 219-220 - Level Crossing Suppression - Supervision

Infraestruturas de Portugal, SA·Almada, Portugal·EUR 1.5M·Expired · Jul 20, 2026·Open·Services
High valueStructured notice only
Titre original de l'avis

Portugal – Construction management services – Aquisição de Serviços - L. NORTE - PK 219 A 220 - DESNIVELAMENTOS PARA SUPRESSÃO DE PASSAGENS DE NIVEL - FISCALIZAÇÃO

55/100

Score d'opportunité

Needs reviewMedium complexity
ServicesExpired
Pourquoi ce score ?

Opportunité

55 / 100

Complexité

60 / 100

Facteurs de risque

Procurement documents (e.g., terms of reference, contract conditions) were not analyzed. Critical details on scope, eli...

Structured data flags EU funding, but XML notice explicitly states 'FundingProgramCode: no-eu-funds'. This may affect c...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Informations clés

Pouvoir adjudicateur
Infraestruturas de Portugal, SA
Pays
Portugal
CPV
71540000 - Construction management services
Date limite
Jul 20, 2026
Valeur estimée
EUR 1.5M

Aperçu

Moderate opportunity

Faits clés

  • EUR 1.5M estimated value
  • Services contract
  • 1 lot
  • Duration 830 DAY
  • Construction management (fiscalização) for suppression of level crossings on the Northern Line (PK 219-220) in Coimbra, Portugal.
  • Includes earthworks and construction of grade-separated crossings (desnivelamentos).
Afficher le résumé complet

Infraestruturas de Portugal seeks construction management services (fiscalização) for a project to suppress level crossings (PK 219-220) on the Northern Line in Coimbra, Portugal. Open procedure under utilities directive. Single lot, estimated value €1,500,000, duration 830 days. Award based on quality (50%) and price (50%). Deadline: 20 July 2026 17:00 (WEST). Note: Structured data indicates EU funding, but XML notice lists no EU funds. A guarantee is required. Only Portuguese language accepted. No procurement documents were analyzed.

Risques

Procurement documents (e.g., terms of reference, contract conditions) were not analyzed. Critical details on scope, eli...

Structured data flags EU funding, but XML notice explicitly states 'FundingProgramCode: no-eu-funds'. This may affect c...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Open procedure – any interested economic operator may bid.

Administrative

  • Submission must be electronic via the ANOGOV platform.
  • Tenders must be submitted in Portuguese (only language detected).

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Quality (50%) – specific sub-criteria not detailed. — 50%Price (50%) – lowest price or cost-effectiveness not specified. — 50%

Acheteur

Localisation

Almada, PRT

Profil acheteur

Ouvrir le profil

Identifiant

503933813

Activité

General public services

Lots (1)

LOT-0000

Construction Management Services - Northern Line PK 219-220 - Level Crossing Suppression - Supervision

Supervision and inspection services for the elimination of level crossings between km 219 and 220 on the Northern Line in Coimbra, Portugal. Execution of earthworks and construction to replace level crossings with grade-separated crossings.

ServicesEU fundedElectronic submissionSME suitable

EUR 1.5M

Valeur estimée

Localisation

Coimbra, Portugal

Durée

830 DAY

Catégorie

Construction management services

Critères d'attribution

Best price-quality ratio

Date limite

Expired Jul 20, 2026

Détails de la procédure

Date de publication
21 Jun 2026
Langues
Portuguese

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
427749-2026

Documents (2)

Appels d'offres similaires