Railway Bridge Construction and Demolition

C.N.C.F "C.F.R." S.A. - SUCURSALA REGIONALĂ C.F. BRAȘOV - UNITATE OPERAȚIONALĂ·Brasov, Romania·RON 75.1M | EUR 14.3M·Expired · Jul 31, 2026·Open·Works
High valueStructured notice only
Titre original de l'avis

Romania – Railway bridge construction work – ”POD CF NOU KM 317+950, LINIA CF DEDA – RĂZBOIENI ȘI DEMOLAREA PODULUI CF EXISTENT (EXECUŢIE)“ SRCF BRAȘOV

40/100

Score d'opportunité

Needs reviewMedium complexity
WorksExpired
Pourquoi ce score ?

Opportunité

40 / 100

Complexité

60 / 100

Facteurs de risque

Contract signing is conditional on funding approval. If not obtained within 12 months, procedure may be canceled withou...

Deadline time differs between structured data (12:00) and XML (15:00). Also EU funding flag inconsistency (structured...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Informations clés

Pouvoir adjudicateur
C.N.C.F "C.F.R." S.A. - SUCURSALA REGIONALĂ C.F. BRAȘOV - UNITATE OPERAȚIONALĂ
Pays
Roumanie
CPV
45221112 - Railway bridge construction work +1 autres
Date limite
Jul 31, 2026
Valeur estimée
RON 75.1M (approx. EUR 14.3M)

Aperçu

Moderate opportunity

Faits clés

  • RON 75.1M estimated value
  • Works contract
  • 1 lot
  • Duration 20 MONTH
  • Construction of a new railway bridge (170.10 m total length, 2 spans of 80 m each)
  • Demolition of existing railway bridge
Afficher le résumé complet

This is an open procedure for the construction of a new railway bridge at km 317+950 on the Deda–Războieni line, including demolition of the existing bridge. The contract is for works, with an estimated value of 75,106,506.88 RON (approx. 14.3M EUR). The contracting authority is C.N.C.F "C.F.R." S.A. - Sucursala Regională C.F. Brașov. The procedure is subject to a suspensive clause: contract signing depends on funding approval, which may take up to 12 months. Submission deadline is 31 July 2026. Award is based on price (95%) and warranty period (5%).

Risques

Contract signing is conditional on funding approval. If not obtained within 12 months, procedure may be canceled withou...

Deadline time differs between structured data (12:00) and XML (15:00). Also EU funding flag inconsistency (structured...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • DUAE must be completed by all bidders, associates, and subcontractors
  • Bid bond required (guarantee type code true)

Administrative

  • Electronic submission via SEAP (required)

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price criterion (95%) — 95%Warranty period (5%) — 5%

Acheteur

Localisation

Brasov, ROU

Site web

www.cfr.ro

Profil acheteur

Ouvrir le profil

Identifiant

15509275

Activité

Railway services

Lots (1)

LOT-0000

Railway Bridge Construction and Demolition

Construction of a new railway bridge (total length 170.10 m, two spans of 80 m each), a level crossing, and railway line in definitive route of 1200 m. Demolition of existing bridge. Duration 20 months, with possible extension up to 4 months per year due to cold weather.

WorksEU fundedElectronic submission

EUR 14.3M

Valeur estimée

Localisation

RO122, Romania

Durée

20 MONTH

Catégorie

Railway bridge construction work

Critères d'attribution

Price

Date limite

Expired Jul 31, 2026

Détails de la procédure

Date de publication
21 Jun 2026
Langues
Romanian

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
426137-2026