Aire de repos 24h pour transport lourd sur E39
Titre original de l'avis
Norway – Real estate services – Establishment, operation and maintenance of a 24 hour resting place for heavy transport along the E39 Knarvik - Oppedal - 2nd time notice.
Score d'opportunité
Pourquoi ce score ?
Opportunité
65 / 100
Complexité
60 / 100
Facteurs de risque
Contracting authority reserves right to negotiate in several phases and reduce number of tenders, which could exclude q...
Facility must be operational within 16 months; any delays could incur penalties (not specified).
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Informations clés
- Pouvoir adjudicateur
- Statens vegvesen
- Pays
- Norvège
- CPV
- 70000000 - Real estate services +5 autres
- Date limite
- Aug 17, 2026
- Valeur estimée
- NOK 42.2M (approx. EUR 3.8M)
Aperçu
Moderate opportunityFaits clés
- NOK 42.2M estimated value
- Services contract
- 1 lot
- Duration 12 YEAR
- Establishment of a 24-hour resting place along E39 with 15-20 parking spaces for heavy transport
- Construction of service facility with toilets and showers
Afficher le résumé complet
The tender is for the establishment, operation and maintenance of a 24-hour resting place for heavy transport along the E39 Knarvik-Oppedal route in Norway. The facility must provide 15-20 parking spaces, toilets/showers, and charging stations for electric lorries. The contract is for 10 years with possible extension of up to 12 years. The procurement follows a negotiated procedure with qualification phase and one negotiation round. Award criteria: price (70%) and quality (30%). The estimated value is NOK 42,247,587, EU-funded. Deadline for submission: 2026-08-17 10:00.
Risques
Contracting authority reserves right to negotiate in several phases and reduce number of tenders, which could exclude q...
Facility must be operational within 16 months; any delays could incur penalties (not specified).
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Minimum 15, maximum 20 parking places
- Service facility with toilets/showers
- Charging stations for electric lorries must be fully developed and operational
Les exigences peuvent être incomplètes.
Critères d'attribution
Lot 1
Acheteur
Localisation
Oslo, NOR
Site web
Profil acheteur
Identifiant
971032081
Activité
General public services
Lots (1)
LOT-0000
Establishment, operation and maintenance of a 24 hour resting place for heavy transport along the E39 Knarvik - Oppedal - 2nd time notice.
Single lot covering design, build, operation and maintenance of a 24-hour rest area with 15-20 parking spaces, service building, and EV charging infrastructure. Contract duration 10-12 years. Must be operational within 16 months of signing.
EUR 3.8M
Valeur estimée
Localisation
Durée
Catégorie
Critères d'attribution
Date limite
Détails des critères
Tenderers shall state the price for the hire per annum per parking area. The price shall include all costs in accordance with the requirement specifications points 3.2 and 3.3 and it shall cover the establishment, operation and maintenance of the 24 hour resting place. Tenderers shall enclose a completed price form, cf. annex 1 - Price form.
K1: The evaluation of quality is based on an assessment of the responses to deliveries that the contracting authority wants (ought-requirements), cf. the requirement specifications point 3.3. The sub-criteria in the award criteria quality: Service offer for the users of the 24 hour resting place (point 3.3 letter a) Wishes for earlier opening (point 3.3 letter b) Covered outside area (point 3.3 letter c) Documentation requirement: Tenderers shall fill in the "Response form for shall-requirements and ought-requirements", cf. annex 2. Documentation requirement for point 1: Each service offer must be described, among other things, accessibility, distances and opening hours must be described. Documentation requirement for point 2: Tenderers shall give an account of their progress plan and the planned opening hours of the 24 hour resting place. Documentation requirement for point 3: The tenderer shall enclose a drawing of the 24 hour resting place where it appears where the outdoor area has a roof superstructure.
There is no requirement for 30% weighting of climate and environmental considerations. The contracting authority can replace climate and environmental considerations in the award criteria with climate and environmental requirements in the requirement specification, if it is clear that this gives better climate and environmental effect. Several different requirements are made in the requirement specification, including: - All areas that must be developed shall have an asphalt-EDP that is lower than 45 kg/tonne in accordance with NS-EN 15804+A2:2019. - Charging stations shall be established for electric lorries. - Cleaning shall be carried out with environmentally friendly products. It has been considered that the effect of setting these requirements (especially the first two hyphenated points) gives a better effect than a possible achievement, if they were used as the award criteria. The requirements and effectiveness of the above requirements are, in our opinion, sufficient to use the exception in PPR § 7-9 (4).
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Description TED originale
The contracting authority invites tenderers to a competition for the establishment, operation and maintenance of a 24 hour resting place at E39 Knarvik - Oppedal. The 24 hour resting place shall have a minimum of 15 and a maximum of 20 parking places and shall include a service facility with toilets/showers. Charging stations are to be established in accordance with requirements in point 3.2 hours. Otherwise, the 24 hour resting place shall fulfil the requirements in chapter 3. The 24 hour resting place shall be ready for opening at the latest 16 months after the contract has been signed and the contract will apply for 10 years from the opening hours. The contracting authority has the option to extend the contract for 1+1 year, so that the total possible lease period is 12 years. The charging infrastructure shall be completely developed and in operation in accordance with point 3.2 h.
Détails de la procédure
- Date de publication
- 21 Jun 2026
- Langues
- English, Norwegian
Métadonnées de référence
- Base juridique
- 32014L0024
Identifiants de référence
- ID de l'appel d'offres
- 424695-2026
Documents (1)
Appels d'offres similaires
Poland – Solar photovoltaic modules – Zielona energia dla Kraśnika – dostawa i montaż instalacji fotowoltaicznych z magazynami energii w ramach projektu pn. „Kraśnik – Bezpieczne Miasto Nowej Generacji” – etap I
Poland – Construction work – Wykonanie projektu budowlano-wykonawczego oraz robót budowlano-montażowych według tego projektu dla zadania pn. „Budowa zasilania MOP Grabin i MOP Ostróda z GPZ Ostróda Wschód”
Poland – Construction work – Przedmiotem postępowania i zamówienia jest realizacja II Etapu inwestycji pn. „Modernizacja i przebudowa budynku Centrum Kultury Rotunda w Krakowie”, obejmująca wykonanie robót budowlanych i instalacyjnych, dostaw, montażu wyposażenia i urządzeń, a także uruchomienie, regulację, próby, odbiory i przekazanie obiektu do użytkowania.
Poland – Construction work – Wykonanie robót budowlanych i instalacyjnych na części powierzchni budynku Centrum Symulacji Medycznych skrzydło B Warszawskiego Uniwersytetu Medycznego, znak sprawy: AEZ/S-164/2026
Poland – Construction work – Rowerowe Roztocze. Drogi pieszo-rowerowe w obszarach wiejskich - budowa dróg pieszo-rowerowych i MOR-u w gminach Modliborzyce i Chrzanów
Poland – Landscaping work – „Zagospodarowanie przestrzeni terenów zielonych przy Ekoszkole – Etap I” Zadanie realizowane w ramach projektu: „AkTYwne Miasto. Razem dla rozwoju Starachowic”
Score d'opportunité
Pourquoi ce score ?
Opportunité
65 / 100
Complexité
60 / 100
Facteurs de risque
Contracting authority reserves right to negotiate in several phases and reduce number of tenders, which could exclude q...
Facility must be operational within 16 months; any delays could incur penalties (not specified).