Design, supply, installation and commissioning of three decanter centrifuges and related equipment

Wodociągi Białostockie Sp. z o.o. w Białymstoku·Białystok, Poland·Expired · Jul 31, 2026·Open·Supplies
Titre original de l'avis

Poland – Machinery for the treatment of sewage – Projekt, dostawę, montaż i uruchomienie trzech wirówek dekantacyjnych wraz z niezbędnym wyposażeniem

62/100

Score d'opportunité

Needs reviewHigh complexity
SuppliesExpired
Pourquoi ce score ?

Opportunité

62 / 100

Complexité

78 / 100

Facteurs de risque

The experience requirement is specific and requires completed references meeting capacity/throughput thresholds and com...

Several named roles and qualifications are required, including multiple designers and commissioning specialists.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Supplies contract
  • 1 lot
  • Duration 18 MONTH
  • Design and obtain the required administrative decisions for the installation.
  • Supply, install, integrate and commission three decanter centrifuges.
Afficher le résumé complet

Open EU-funded Polish procurement by Wodociągi Białostockie for design, delivery, installation and commissioning of three decanter centrifuges and related mechanical/electrical/automation works at the Białystok wastewater treatment plant. The notice is structured as one lot, price-only award, with electronic submission required. Main execution risks are the strong technical reference requirements, multiple named specialists, and the bid security of PLN 150,000. No contract value is published in the structured data or XML provided.

Risques

The experience requirement is specific and requires completed references meeting capacity/throughput thresholds and com...

Several named roles and qualifications are required, including multiple designers and commissioning specialists.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Bid security (wadium) is PLN 150,000.
  • The contract duration is 18 months.

Administrative

  • Electronic submission is required.

Critères d'attribution

Lot 1

Price, 100% weight (explicitly stated)100%

Acheteur

Lots (1)

LOT-0001

Design, supply, installation and commissioning of three decanter centrifuges and related equipment

Single-lot design-and-build procurement for a complete sludge dewatering installation at the wastewater treatment plant in Białystok, including design, permits, delivery, installation, integration, commissioning, final tests, trial operation and handover. Scope explicitly covers three decanter centrifuges plus process, electrical, instrumentation/control, automation, software and associated works. Source: structured data and XML notice.

SuppliesEU fundedElectronic submission

Localisation

PL841, Poland

Durée

18 MONTH

Catégorie

The treatment of sewage

Critères d'attribution

Price

Date limite

Expired Jul 31, 2026

Détails de la procédure

Date de publication
18 Jun 2026
Langues
Polish

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
423635-2026