DK9505 Nord-troms 2027-2032
Titre original de l'avis
Norway – Highway operation services – DK9505 Nord-troms 2027-2032
Score d'opportunité
Pourquoi ce score ?
Opportunité
50 / 100
Complexité
80 / 100
Facteurs de risque
No estimated value provided; unknown budget may lead to underpricing or overpricing.
Negotiation phase reduces number of tenderers to 3; may be excluded if initial tender is not among top 3.
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Informations clés
- Pouvoir adjudicateur
- Statens vegvesen
- Pays
- Norvège
- CPV
- 63712200 - Highway operation services +2 autres
- Date limite
- Aug 05, 2026
Aperçu
Moderate opportunityFaits clés
- Services contract
- 1 lot
- Duration until Aug 2032
- Operation and maintenance of national roads, county roads, and cycle paths (total ~561.5 km)
- Winter operations: snow clearing, gritting, salting, snow milling
Afficher le résumé complet
This tender by Statens vegvesen (Norwegian Public Roads Administration) is for the operation and maintenance of national roads, county roads, and cycle paths in the municipalities of Storfjord, Kåfjord, Nordreisa, Kvænangen, Alta, and Kautokeino in northern Norway. The contract period is from 1 September 2027 to 31 August 2032, with options for extensions of up to 36 additional months. The tender uses a negotiated procedure with call for competition, and the award is based on best price-quality ratio. The tender is EU-funded. The total estimated value is not provided.
Risques
No estimated value provided; unknown budget may lead to underpricing or overpricing.
Negotiation phase reduces number of tenderers to 3; may be excluded if initial tender is not among top 3.
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Contract period: 01.09.2027 - 31.08.2032 with possible extensions of 12, 24, or 36 months
- EU-funded project
- Negotiated procedure with call for competition; all qualified tenderers invited to first tender, then may be reduced to 3 for negotiations
Les exigences peuvent être incomplètes.
Critères d'attribution
Lot 1
Acheteur
Localisation
Moss, NOR
Site web
Profil acheteur
Identifiant
971032081
Activité
General public services
Lots (1)
LOT-0000
DK9505 Nord-troms 2027-2032
Operation and maintenance of approximately 561.5 km of roads and cycle paths, including winter operations, sweeping, gritting, and maintenance of side facilities. The contract includes both fixed-sum and unit-price elements.
Localisation
Durée
Catégorie
Critères d'attribution
Date limite
Détails des critères
Award criteria: K1 - Tender Sum The tenderer shall deliver: - Completed chapter E The inspection calculated tender sum will be used as the tender sum (K1) in the calculation of the tender sum.
Award criteria K2 - Climate and environment The contracting authority will emphasise the tenderer's contract specific climate and environmental measures that contribute to environmental effect and reduction of greenhouse gas emissions. The contracting authority will assess the following sub-criteria: K2.1 – Climate The tenderer shall: Filling in and delivering the "climate gas budget for operations contract 9505 North Troms 2027-2032". The climate gas budget shall contain values/sizes/activities that together are suitable for solving the processes: Process 73.31 All assignments connected to sweeping, collecting and flushing. Process 74.82 All assignments related to edge clips as described in process 74.821. Process 95 All tasks related to snow clearing, as described in process 95 (variable part) Process 95 All assignments related to gritting of sand and salt as described in process 95 (variable part) Process 95 All assignments related to planing with heavy road grader Process 95 All assignments connected to snow milling. Deductions up to NOK 200,000,000 K2.2 - Environment The tenderer's activities in order to ensure timely, accurate and "correct" salting and gritting. The tenderer shall deliver: - Description of activities to ensure timely, accurate and "correct" salting and gritting. Deductions up to NOK 40,000,000
K3 - Resources The contracting authority will emphasise that the tenderer ́s offered resources ensure robust and appropriate implementation of the contract, so that the contract specific challenges are dealt with and the contract ́s total risk is reduced. The contracting authority will assess the following sub-criteria: K3.1 - A selection of the resources/personnel in the contract (key personnel). The tenderer ́s share of resources/personnel in the contract with relevant certificates of apprenticeship and the plan for increasing relevant certificates of apprenticeship for resources/personnel in the contract. The tenderer shall deliver: - Completed annex "Ressursplan" - Organisation chart -Share of resources/personnel in the contract with relevant certificates of apprenticeship and a plan for increasing relevant certificates of apprenticeship for resources/personnel in the contract. Deductions up to NOK 20,000,000
K4 - Winter operations The contracting authority will emphasise how the tenderer shall ensure an operational system for winter operations that is robust and appropriate, so that the contract specific challenges are dealt with and the contract ́s total risk is reduced. The contracting authority will assess the following sub-criteria: K4.1 - The tenderer ́s area set up in winter, capacity calculation per lot and logistics for currents. The tenderer shall deliver: - Map of sectioning - Description of the area set-up - Description of capacity calculations for snow clearing and gritting, including specification of units and equipment. - Description of the type of current times, storage type, location and capacity. Deductions up to NOK 40,000,000
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Description TED originale
The assignment comprises operational and maintenance assignments, with function responsibility for some of the assignments, on national roads and national foot/cycle paths as well as selected county roads with the accompanying side facilities, side areas, equipment and installations, in Storfjord, Kåfjord, Nordreisa, Kvænangen, Alta and Kautokeino municipalities in accordance with the road list given in chapter. D2-V1 and D2-S20. The contract will be valid from 01.09.2027 to and including 31.08.2032 for all the assignments that have been described. The road network included in the assignment (including metrated arms, ramps, junction parts and side-system parts, but not including annexes or oncoming roadways) consists of: 561,551 km road in total whereof 481,411 km national road 18,432 km county road 61,709 km national foot and cycle path The work will be settled with a round sum for round sum processes, in accordance with quantities and unit prices for other processes and as maths works in accordance with hourly rates for crews and machines. By agreement, the parties can extend the contract to also apply for a period of further 12, 24 or 36 months, cf. chapter C3, point 21 (cf. C4, point 10). The builder has the option to extend the contract for 12 months, from and including 1 September in the year. the contract had been agreed to terminate (i.e. either at the end of the original contract period, or at the end of extended contract period in accordance with the previous section), up to and including 31 August the following year.
Détails de la procédure
- Date de publication
- 18 Jun 2026
- Langues
- English, Norwegian
Métadonnées de référence
- Base juridique
- 32014L0024
Identifiants de référence
- ID de l'appel d'offres
- 423572-2026
Documents (1)
Appels d'offres similaires
Sweden – Installation of road lighting equipment – Drift och underhåll av gatu- och parkbelysning, område Sydväst
Norway – Construction work – Dynamic purchasing system for contractor services - Vennesla municipality
Spain-Malaga: Repair, maintenance and associated services related to roads and other equipment
United Kingdom-London: Construction work
Score d'opportunité
Pourquoi ce score ?
Opportunité
50 / 100
Complexité
80 / 100
Facteurs de risque
No estimated value provided; unknown budget may lead to underpricing or overpricing.
Negotiation phase reduces number of tenderers to 3; may be excluded if initial tender is not among top 3.
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications