Procurement of New Finker
Titre original de l'avis
Norway – Railway and tramway locomotives and rolling stock and associated parts – Procurement of New Finker
Score d'opportunité
Pourquoi ce score ?
Opportunité
45 / 100
Complexité
40 / 100
Facteurs de risque
Award criteria and detailed technical specifications are not available in the notice, making it difficult to assess bid...
Railway rolling stock procurement is technically specialized; unknown specifications may pose challenges for non-specia...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Aperçu
Moderate opportunityFaits clés
- NOK 40M estimated value
- Supplies contract
- 1 lot
- Supply of three Finker units (railway rolling stock) for Norwegian trains.
- Options for additional units: compressor for each container, chassis for containers, extra finke, external 1000-volt outlet.
Afficher le résumé complet
Procurement of three Finker (railway rolling stock) with options for additional units, by Norske tog AS, an open procedure. Estimated value 40,000,000 NOK. Submission deadline 2026-08-14. Single lot, performance in Trondheim, Norway. No explicit award criteria or eligibility criteria beyond standard exclusion grounds.
Risques
Award criteria and detailed technical specifications are not available in the notice, making it difficult to assess bid...
Railway rolling stock procurement is technically specialized; unknown specifications may pose challenges for non-specia...
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Delivery of three Finker units with optional extras.
Administrative
- Compliance with technical specifications defined in procurement documents.
- Electronic submission required via EU-Supply platform.
Les exigences peuvent être incomplètes.
Acheteur
Localisation
Oslo, NOR
Profil acheteur
Identifiant
917445060
Activité
Railway services
Lots (1)
LOT-0000
Procurement of New Finker
Supply of three Finker units for Norwegian trains, with options for additional units (compressor, chassis, extra finke, external 1000-volt outlet). Performance in Trondheim, Norway.
EUR 3.6M
Valeur estimée
Localisation
Catégorie
Date limite
Détails des critères
Norwegian trains require three Finker, with an option for additional units.
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Description TED originale
Norwegian trains require three Finker, with an option for additional units.
Détails de la procédure
- Date de publication
- 18 Jun 2026
- Langues
- English, Norwegian
Métadonnées de référence
- Base juridique
- 32014L0025
Identifiants de référence
- ID de l'appel d'offres
- 422187-2026
Documents (1)
Appels d'offres similaires
Italy – Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment – eGPA 10866 "CASSA AT PER IMPIANTO DI RISCALDAMENTO"
Denmark – Partially underground railway works – Copenhagen - New Metroline, M5 Transportation System
Italy – Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment – eGPA soprasoglia n° 10885 per la fornitura di “ricambi e componenti relativi ai sistemi pantografi” suddivisa in 4 lotti
Italy – Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment – eGPA_10880_Fornitura KIT DI MATERIALI VARI E RICAMBI PER ROTABILI FERROVIARI
Denmark – Partially underground railway works – Copenhagen - New Metroline, M5 Transportation System
Italy – Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment – eGPA10783 Affidamento in appalto della fornitura dei “giunti gonfiabili per le ante delle porte di salita dell’ETR500”
Score d'opportunité
Pourquoi ce score ?
Opportunité
45 / 100
Complexité
40 / 100
Facteurs de risque
Award criteria and detailed technical specifications are not available in the notice, making it difficult to assess bid...
Railway rolling stock procurement is technically specialized; unknown specifications may pose challenges for non-specia...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications