Upgrade of RTP 110/20 kV Brnik and supply and installation of HV electrical equipment

ELEKTRO GORENJSKA, podjetje za distribucijo električne energije, d.d.·Kranj, Slovenia·Expired · Jul 16, 2026·Restricted·Supplies
Structured notice only
Titre original de l'avis

Slovenia – Electricity distribution and control apparatus – Dograditev RTP 110/20 kV Brnik ter dobava in montaža VN energetske opreme

40/100

Score d'opportunité

Needs reviewHigh complexity
SuppliesExpired
Pourquoi ce score ?

Opportunité

40 / 100

Complexité

70 / 100

Facteurs de risque

Missing estimated contract value makes it impossible to assess budget adequacy and competitive positioning.

Incomplete award criteria description: structured data shows only price, but XML suggests quality and cost criteria. Am...

Restricted procedure — pre-qualification required

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Informations clés

Pouvoir adjudicateur
ELEKTRO GORENJSKA, podjetje za distribucijo električne energije, d.d.
Pays
Slovénie
CPV
31200000 - Electricity distribution and control apparatus
Date limite
Jul 16, 2026

Aperçu

Moderate opportunity

Faits clés

  • Supplies contract
  • 1 lot
  • Duration 26 MONTH
  • Construction of new 110 kV GIS switchyard at RTP Brnik
  • Supply and installation of 2x40 MVA power transformers
Afficher le résumé complet

This tender is a restricted procedure for the upgrade of the 110/20 kV Brnik substation in Slovenia, including supply and installation of HV electrical equipment (transformers, GIS switchgear, cable conduits). The contract is EU-funded and suitable for SMEs. Only structured notice data and an XML notice are available; no procurement documents were analyzed. The estimated value is not provided, and award criteria appear inconsistent between sources (price only vs. including quality and cost). The deadline for tender submission is 2026-07-16T08:00 according to structured data, but XML indicates 10:00. All documentation is in Slovenian. Key risks include missing value, incomplete eligibility and award criteria, and language barriers.

Risques

Missing estimated contract value makes it impossible to assess budget adequacy and competitive positioning.

Incomplete award criteria description: structured data shows only price, but XML suggests quality and cost criteria. Am...

Restricted procedure — pre-qualification required

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Restricted procedure: bidders must undergo pre-qualification
  • EU funding compliance required

Administrative

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price criterion (weight not specified)

Acheteur

Localisation

Kranj, SVN

Identifiant

5175348000

Activité

Economic affairs

Lots (1)

LOT-0000

Upgrade of RTP 110/20 kV Brnik and supply and installation of HV electrical equipment

Construction of a new 110 kV GIS switchyard, supply and installation of 2x40 MVA power transformers, expansion of 20 kV switchgear, and construction of cable conduit for 110 kV cable connections. Duration 26 months.

SuppliesEU fundedElectronic submissionSME suitable

Localisation

SI042, Slovenia

Durée

26 MONTH

Catégorie

Electricity distribution

Critères d'attribution

Price

Date limite

Expired Jul 16, 2026

Détails de la procédure

Date de publication
16 Jun 2026
Langues
Slovenian

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
416454-2026

Documents (2)