Design-build contract for airport infrastructure compliance works
Titre original de l'avis
France – Runway resurfacing – Mise en conformité des infrastructures aéroportuaires de l'aéroport de Tarbes Lourdes Pyrénées
Score d'opportunité
Pourquoi ce score ?
Opportunité
56 / 100
Complexité
68 / 100
Facteurs de risque
The submission deadline is relatively close to the publication date, leaving limited time to prepare a compliant bid.
Only the XML notice text was extracted; the underlying procurement documents were not analyzed, so technical, contractu...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Aperçu
Moderate opportunityFaits clés
- Works contract
- 1 lot
- Duration 30 MONTH
- Design-build works for compliance of airport infrastructure at Tarbes Lourdes Pyrénées airport.
- Runway resurfacing.
Afficher le résumé complet
This is a French works contract for the design-and-build compliance upgrade of Tarbes Lourdes Pyrénées airport infrastructure, focused on runway resurfacing and related airport engineering. The notice indicates electronic submission is required, the procedure is negotiated with call, and the contract duration is 30 months. No contract value is provided in the structured data or XML notice. The extracted XML notice adds optional variants/PSEs and indicates candidate reduction is possible, but the procurement documents themselves were not analyzed beyond the XML notice text.
Risques
The submission deadline is relatively close to the publication date, leaving limited time to prepare a compliant bid.
Only the XML notice text was extracted; the underlying procurement documents were not analyzed, so technical, contractu...
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Procedure type is negotiated with call.
- Contract duration is 30 months.
Administrative
- Electronic submission is required.
Acheteur
Localisation
carcassonne, FRA
Profil acheteur
Identifiant
85282836700015
Activité
Airport-related activities
Lots (1)
LOT-0001
Design-build contract for airport infrastructure compliance works
Design-build works for the compliance upgrade of Tarbes Lourdes Pyrénées airport infrastructure. Scope includes runway resurfacing and airport engineering services. The XML notice also lists optional variants/PSEs: PSE No. 01 unpaved load-bearing and anti-blast shoulders, PSE No. 02 paved shoulders over 7.50 m, PSE No. 03 Taxiway Alpha Code E, and PSE No. 04 reserves for runway centerline.
Localisation
Durée
Catégorie
Date limite
Détails des critères
Marché de Conception-Réalisation pour la mise en conformité des infrastructures aéroportuaires de l'aéroport de Tarbes Lourdes Pyrénées
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Titre original du lot
Marché de Conception-Réalisation pour la mise en conformité des infrastructures aéroportuaires de l'aéroport de Tarbes Lourdes Pyrénées
Description TED originale
Marché de Conception-Réalisation pour la mise en conformité des infrastructures aéroportuaires de l'aéroport de Tarbes Lourdes Pyrénées
Détails de la procédure
- Date de publication
- 15 Jun 2026
- Langues
- French
Métadonnées de référence
- Base juridique
- 32014L0024
Identifiants de référence
- ID de l'appel d'offres
- 410923-2026
Documents (2)
Appels d'offres similaires
Score d'opportunité
Pourquoi ce score ?
Opportunité
56 / 100
Complexité
68 / 100
Facteurs de risque
The submission deadline is relatively close to the publication date, leaving limited time to prepare a compliant bid.
Only the XML notice text was extracted; the underlying procurement documents were not analyzed, so technical, contractu...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications