Tenderwize
Retour à la recherche

Upgrade of rectifier plants at Südbahnhof, Rossmarkt, Parlamentsplatz

Stadtwerke Verkehrsgesellschaft Frankfurt am Main mbH (VGF)·Frankfurt am Main, Germany·EUR 1·Expired · Jul 23, 2026·Open·Works
Structured notice only
Titre original de l'avis

Germany – Railway construction works – Fahrstromverstärkung 750 V - Ertüchtigung der Gleichrichterwerke Südbahnhof / Rossmarkt / Parlamentsplatz (3 Lose)

55/100

Score d'opportunité

Needs reviewHigh complexity
WorksExpired
Pourquoi ce score ?

Opportunité

55 / 100

Complexité

75 / 100

Facteurs de risque

The estimated contract value is a placeholder (1 EUR). No budget indication makes bid/no-bid decision and pricing strat...

Submission deadline is only about 5 weeks after publication. Requires rapid qualification and pricing.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • EUR 1 estimated value
  • Works contract
  • 3 lots
  • Duration until Apr 2028
  • Supply and installation of 12-pulse rectifiers and double-stack transformers
  • Replacement of complete DC switchgear
Afficher le résumé complet

This tender by VerkehrsGesellschaft Frankfurt am Main mbH (VGF) involves the reinforcement of the 750 V traction power supply through the upgrading of three tunnel rectifier substations (Südbahnhof, Rossmarkt, Parlamentsplatz) in Frankfurt am Main. The work includes supply and installation of 12-pulse rectifiers and double-stack transformers, replacement of DC switchgear, and removal of old equipment. The procedure is open under the EU Utilities Directive (2014/25/EU). No estimated value is provided; the published value of 1 EUR is a placeholder. The submission deadline is 23 July 2026, 10:00 CEST. A mandatory site visit and signed confidentiality agreement are required to access key documents.

Risques

The estimated contract value is a placeholder (1 EUR). No budget indication makes bid/no-bid decision and pricing strat...

Submission deadline is only about 5 weeks after publication. Requires rapid qualification and pricing.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Maximum of 3 lots can be bid (all lots can be bid)

Administrative

  • Mandatory site visit before offer submission
  • Signed confidentiality agreement required to access restricted tender documents

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price (70%)70%Quality assessment based on criteria catalog (30%)30%

Lot 2

Price (70%)70%Quality assessment based on criteria catalog (30%)30%

Lot 3

Price (70%)70%Quality assessment based on criteria catalog (30%)30%

Acheteur

Localisation

Frankfurt am Main, DEU

Profil acheteur

Ouvrir le profil

Identifiant

1698af6e-a096-45d4-a96e-39c0accd6b60

Activité

Urban railway, tramway, trolleybus or bus services

Lots (3)

LOT-0001

Upgrading of Rectifier Substation Südbahnhof Lot 1

Upgrade of the tunnel rectifier substation at Südbahnhof to reinforce the 750 V DC traction power supply for the Stadtbahn. Includes supply and installation of rectifiers, transformers, replacement of DC switchgear, and removal of old equipment.

WorksEU fundedElectronic submission

EUR 1

Valeur estimée

Localisation

Frankfurt am Main, Germany

Durée

Oct 2026 - Apr 2028

Catégorie

Railway construction works

Critères d'attribution

Best price-quality ratio

Date limite

Expired Jul 23, 2026

LOT-0002

Upgrading of Rectifier Substation Rossmarkt Lot 2

Upgrade of the tunnel rectifier substation at Rossmarkt. Scope identical to Lot 1.

WorksEU fundedElectronic submission

EUR 1

Valeur estimée

Localisation

Frankfurt am Main, Germany

Durée

Oct 2026 - Apr 2028

Catégorie

Railway construction works

Critères d'attribution

Best price-quality ratio

Date limite

Expired Jul 23, 2026

LOT-0003

Upgrading of Rectifier Substation Parlamentsplatz Lot 3

Upgrade of the tunnel rectifier substation at Parlamentsplatz. Scope identical to Lot 1.

WorksEU fundedElectronic submission

EUR 1

Valeur estimée

Localisation

Frankfurt am Main, Germany

Durée

Oct 2026 - Apr 2028

Catégorie

Railway construction works

Critères d'attribution

Best price-quality ratio

Date limite

Expired Jul 23, 2026

Détails de la procédure

Date de publication
14 Jun 2026
Langues
German

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
409775-2026

Documents (1)

Appels d'offres similaires