Tenderwize
Retour à la recherche

Construction, supply and commissioning of biomass boiler K2

Environmental Energy, s.r.o.·Kožichovice, Czech Republic·CZK 17.5M | EUR 724k·Expired · Jul 17, 2026·Open·Supplies
Structured notice only
Titre original de l'avis

Czechia – Boilers – Výstavba, dodávka a uvedení do provozu biomasového kotle K2

70/100

Score d'opportunité

PromisingMedium complexity
SuppliesExpired
Pourquoi ce score ?

Opportunité

70 / 100

Complexité

60 / 100

Facteurs de risque

Eligibility criteria and required documents are not specified; bidders may be disqualified if they fail to meet unknown...

Complex integration with existing equipment (cogeneration, K1 boiler, heat pumps) and district heating may require spec...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Strong opportunity

Faits clés

  • CZK 17.5M estimated value
  • Supplies contract
  • 1 lot
  • Duration until Feb 2027
  • Project design, supply, manufacture, installation, and commissioning of a biomass boiler K2 with thermal output of 2-2.4 MWt.
  • Construction of fuel storage, ash handling system, and flue gas cleaning.
Afficher le résumé complet

The tender is for the construction, supply, and commissioning of a biomass boiler K2 (2-2.4 MWt) in Třebíč, Czech Republic. It includes design, installation, fuel storage, ash handling, flue gas cleaning, connection to existing systems, and building works. The single lot is awarded based on lowest price (100% weight). The estimated value is CZK 17,500,000 (approx. EUR 723,320). The deadline for submission is 17 July 2026, 08:00 UTC. No procurement documents beyond the notice were analyzed, so eligibility and document requirements are unknown.

Risques

Eligibility criteria and required documents are not specified; bidders may be disqualified if they fail to meet unknown...

Complex integration with existing equipment (cogeneration, K1 boiler, heat pumps) and district heating may require spec...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Single lot, open procedure.

Administrative

  • Electronic submission required via buyer profile.
  • Language: Czech.

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Lowest price (100% weight).100%

Acheteur

Localisation

Kožichovice, CZE

Profil acheteur

Ouvrir le profil

Identifiant

05427592

Activité

General public services

Lots (1)

LOT-0001

Construction, supply and commissioning of biomass boiler K2

Design, supply, installation, and commissioning of a biomass boiler K2 (2-2.4 MWt) including fuel storage, ash handling, flue gas cleaning, connection to existing distribution and control systems, building works, and coordination with existing equipment (cogeneration, biomass boiler K1, heat pumps).

SuppliesEU fundedElectronic submissionSME suitable

EUR 724k

Valeur estimée

Localisation

CZ063, Czech Republic

Durée

Jul 2026 - Feb 2027

Catégorie

Boilers

Critères d'attribution

Price

Date limite

Expired Jul 17, 2026

Détails de la procédure

Date de publication
14 Jun 2026
Langues
Czech

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
408377-2026

Documents (1)