Photovoltaic Park and Grid Connection

ORAS NEHOIU·Nehoiu, Romania·RON 1.8M | EUR 351.9k·Expired · Jul 15, 2026·Open·Works
Structured notice only
Titre original de l'avis

Romania – Solar panel roof-covering work – Atribuire contractului de lucrări: „Parc fotovoltaic și racordarea la sistemul energetic Oraș Nehoiu"

60/100

Score d'opportunité

Needs reviewMedium complexity
WorksExpired
Pourquoi ce score ?

Opportunité

60 / 100

Complexité

50 / 100

Facteurs de risque

Full procurement documents (specifications, contract terms, technical details) were not analyzed; critical requirements...

Submission deadline is only about 34 days from notice publication; may be tight for preparing a competitive bid.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • RON 1.8M estimated value
  • Works contract
  • 1 lot
  • Duration 9 MONTH
  • Design and construction of a 0.4 MW photovoltaic park
  • Grid connection (LES 20 kW) to the energy system of Nehoiu
Afficher le résumé complet

Public works contract for the design and construction of a photovoltaic park (0.4 MW) and grid connection in Nehoiu, Romania, financed by the Modernisation Fund. Single lot, open procedure, award based on price (40%) and quality (60%: guarantee period and panel efficiency). EU-funded, with a 9-month execution period.

Risques

Full procurement documents (specifications, contract terms, technical details) were not analyzed; critical requirements...

Submission deadline is only about 34 days from notice publication; may be tight for preparing a competitive bid.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • EU-funded project under the Modernisation Fund (contract no. 1403/09.12.2025)
  • Maximum capacity 0.4 MW
  • Execution period: 9 months

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price – 40 points40%Warranty period – 30 points30%Panel efficiency – 30 points30%

Acheteur

Localisation

Nehoiu, ROU

Profil acheteur

Ouvrir le profil

Identifiant

4055807

Activité

General public services

Lots (1)

LOT-0000

Photovoltaic Park and Grid Connection

Construction of a 0.4 MW photovoltaic park including solar panels, electrical installations, and grid connection (LES 20 kW) to replace conventional electricity with renewable sources.

WorksEU fundedElectronic submission

EUR 351.9k

Valeur estimée

Localisation

RO222, Romania

Durée

9 MONTH

Catégorie

Solar panel roof-covering work

Critères d'attribution

Price

Date limite

Expired Jul 15, 2026

Détails de la procédure

Date de publication
11 Jun 2026
Langues
Romanian

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
402899-2026