Romania – Road construction works – "PROIECTARE SI EXECUȚIE LUCRĂRI: „Drum TransRegio Feleac TR 35 – Etapa I Centura Metropolitană TR 35 și Drumuri de Legătură – Faza I Centura Metropolitană TR 35 şi Drumuri de legătură, Lot 3: drumul TR35 între km 19+600 și km 24+365, incluzând Nodul 8-(Basarabiei), Nodul 9 (Frunzișului), cu tunelurile 1+2+3 și drumul de legătură DL B8 (Tr 35 Nod 9 – Strada Frunzișului din Municipiul Cluj-Napoca)
Opportunity Score
Confidence: 70%
Complexity: high
31 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This open tender by Municipiul Cluj-Napoca covers design and construction of Lot 3 of the Metropolitan Beltway TR 35, including tunnels and a connecting road. The contract is valued at approximately 1.08 billion RON (about 220 million EUR) with a 48-month duration (17 months design, 31 months execution). Submission is electronic in Romanian only, deadline 20 July 2026. Award criteria are weighted: price (40%) and quality (60%) with specific sub-criteria. Only operators from EU/EEA/GPA countries are eligible.
Strengths
Documents available
Open procedure
31 days left
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Open procedure under Romanian public procurement law (Law 98/2016)
- Electronic submission via SEAP (Open portal)
- Tenders in Romanian language only
Award Criteria
Pretul ofertei
Punctajul se acorda astfel: a) Pentru cel mai scazut dintre preturi se acorda punctajul maxim alocat; b) Pentru celelalte preturi ofertate punctajul P(n) se calculeaza proportional, astfel: P(n) = (Pret minim ofertat / Pret n) x punctaj maxim alocat.
| Criterion | Type |
|---|---|
Pretul ofertei Punctajul se acorda astfel: a) Pentru cel mai scazut dintre preturi se acorda punctajul maxim alocat; b) Pentru celelalte preturi ofertate punctajul P(n) se calculeaza proportional, astfel: P(n) = (Pret minim ofertat / Pret n) x punctaj maxim alocat. | Price |
Buyer
Name
Municipiul Cluj-Napoca
Location
Cluj-Napoca, ROU
Website
Buyer profile
Identifier
4305857
Lots (1)
Design and execution of road TR35 from km 19+600 to km 24+365, including nodes 8 and 9, tunnels 1,2,3, and connecting road DL B8. Scope includes road construction, civil engineering works, and engineering services.
Procurement Details
Publication
08 Jun 2026
Deadline
20 Jul 2026, 12:00
Procedure
open
Contract
works
Duration
48 MONTH
Language
RON
Publication #
394152-2026
Classification
Performance: Romania
Documents (2)
Similar tenders
Romania – Road-maintenance works – Întreţinere drumuri asfaltate – acord cadru - 4 ani - Sector Criș.
Romania – Roadworks – Elaborare documentatie tehnica pentru obtinerea autorizatiei de construire (DTAC), proiect tehnic pentru executia lucrarilor (PT), asistenta tehnica din partea proiectantului pe perioada executarii lucrarilor si executie lucrari pentru obiectivul de investitii: Modernizare strada Apateului – tronson cu nr.28-30 - Conform C.F. NR. 207356, Municipiul Oradea, Judetul Bihor
Romania – Parking lot construction work – lucrări de execuție pentru investiția ”construire parcare în regim P+2E pentru parcare Long Term P5”
Romania – Park-and-ride facility construction work – Executie lucrari in cadrul proiectului ,,Terminal multimodal si baza Park & Ride"
Romania – Construction work for water and sewage pipelines – MS-CL-R02-Lot 01VN Lucrări pe sistemele de alimentare cu apă Vărgata, Miercurea Nirajului MS-CL-R02-Lot 02VN Lucrări pe sistemele de alimentare cu apa Gălești, Păsăreni MS-CL-R02-Lot 03VN Lucrări pe ssstemele de alimentare cu apă Gh Doja, Acățari MS-CL-R02-Lot 04TN Lucrări pe sistemele de alimentare cu apă Mica,Bahnea MS-CL-R02-Lot 05CS Lucrări pe sistemele de alimentare cu apă Cristuru Secuiesc
Romania – Construction work for highways, roads – PROIECTARE SI EXECUTIE “Autostrada Craiova – Filiasi si Drum Expres Filiasi – Targu Jiu – Lotul 4”
Opportunity Score
Confidence: 70%
Complexity: high
31 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation