Building contractor for sustainability and renovation of De Bronspot swimming pool in Brunssum
Titre original de l'avis
Netherlands – Construction work for swimming pool – Bouwkundig aannemer bouwteam verduurzaming en renovatie zwembad De Bronspot te Brunssum
Score d'opportunité
Pourquoi ce score ?
Opportunité
50 / 100
Complexité
55 / 100
Facteurs de risque
Full procurement documents (selection and tender guidelines) are referenced but were not provided for analysis. Eligibi...
Top-level estimated value (€4,161,157) differs from lot-level value (€4,793,388). This may affect budget planning and f...
Restricted procedure — pre-qualification required
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Informations clés
- Pouvoir adjudicateur
- Gemeente Brunssum
- Pays
- Pays-Bas
- CPV
- 45212212 - Construction work for swimming pool
- Date limite
- Jun 15, 2026
- Valeur estimée
- EUR 4.2M
Aperçu
Moderate opportunityFaits clés
- EUR 4.2M estimated value
- Works contract
- 1 lot
- Duration until Sep 2027
- Renovation and sustainability upgrade of an existing swimming pool (De Bronspot, Brunssum)
- Replacement of technical installations that are fully depreciated
Afficher le résumé complet
This tender from Gemeente Brunssum seeks a building contractor for the sustainability renovation and modernization of swimming pool De Bronspot in Brunssum, Netherlands. The project involves a restricted procedure with a building team approach (bouwteam). The notice indicates a significant value discrepancy between the top-level estimated value (€4,161,157) and the lot-specific value (€4,793,388). The selection phase deadline is June 15, 2026, with a maximum of 7 candidates invited to tender. Full procurement documents, including selection and tender guidelines, were not analyzed. The notice also shows a conflict regarding EU funding: structured data states EU-funded, while XML notice explicitly states no EU funds.
Risques
Full procurement documents (selection and tender guidelines) are referenced but were not provided for analysis. Eligibi...
Top-level estimated value (€4,161,157) differs from lot-level value (€4,793,388). This may affect budget planning and f...
Restricted procedure — pre-qualification required
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Participation in a restricted procedure with selection phase and subsequent tender phase
- Maximum of 7 candidates will be selected to participate in the tender phase
- Selection phase deadline for requests to participate: June 15, 2026, 10:00 CEST
Les exigences peuvent être incomplètes.
Critères d'attribution
Lot 1
Acheteur
Localisation
Brunssum, NLD
Site web
Identifiant
56725331
Activité
General public services
Lots (1)
LOT-0000
Building contractor for sustainability and renovation of De Bronspot swimming pool in Brunssum
Renovation and sustainability upgrade of the aging swimming pool, including replacement of technical installations, improvement of building envelope, removal of asbestos-containing materials, and functional modernization. The project uses a building team (bouwteam) collaboration model. Available construction budget is €4,793,388.
EUR 4.2M
Valeur estimée
Localisation
Durée
Catégorie
Critères d'attribution
Date limite
Détails des critères
Beschreven in inschrijfleidraad.
Beschreven in inschrijfleidraad
Note sur la valeur
Afficher les données TED originales
Titre original du lot
Bouwkundig aannemer bouwteam verduurzaming en renovatie zwembad De Bronspot te Brunssum
Description TED originale
Zwembad De Bronspot aan het Koutenveld 1B in Brunssum is sterk verouderd en kent hoge energie en onderhoudslasten. De technische installaties zijn afgeschreven, de gebouwschil voldoet niet meer aan de huidige eisen en er treden regelmatig storingen en lekkages op. Daarnaast is sprake van asbesthoudende materialen en een verouderde functionele inrichting. Deze combinatie maakt renovatie noodzakelijk om het zwembad toekomstbestendig te maken. Voor de realisatie is een bouwbudget beschikbaar van € 4.793.388,00 beschikbaar.
Détails de la procédure
- Date de publication
- 04 Jun 2026
- Langues
- Dutch
Métadonnées de référence
- Base juridique
- 32014L0024
Identifiants de référence
- ID de l'appel d'offres
- 387704-2026
Documents (1)
Score d'opportunité
Pourquoi ce score ?
Opportunité
50 / 100
Complexité
55 / 100
Facteurs de risque
Full procurement documents (selection and tender guidelines) are referenced but were not provided for analysis. Eligibi...
Top-level estimated value (€4,161,157) differs from lot-level value (€4,793,388). This may affect budget planning and f...
Restricted procedure — pre-qualification required
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications