Romania – Road construction works – Execuție lucrări pentru proiectul „Legătura rutieră între DN 58 și Valea Țerovei (zona industrială)” cod SMIS – 350535
Opportunity Score
Confidence: 40%
Complexity: medium
26 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender by MUNICIPIUL RESITA, Romania, for execution of road construction works connecting DN 58 to Valea Țerovei (industrial area), co-financed under Regional Program Vest 2021-2027. Single main lot (LOT-0000) with estimated value 41,069,518.43 RON, 18-month duration. Submission deadline 2026-07-15T12:00 (UTC). Award based on price (50%) and quality (50%, split into 5 criteria). Only Romanian language accepted. No procurement documents analyzed beyond the notice.
Strengths
Documents available
Open procedure
Medium complexity
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Submission via e-licitatie.ro only (electronic submission required).
- Tenders in Romanian language.
- Variants not allowed.
Award Criteria
Pretul ofertei
Punctajul se acorda astfel: a) Pentru cel mai scazut dintre preturi se acorda punctajul maxim alocat; b) Pentru celelalte preturi ofertate punctajul P(n) se calculeaza proportional, astfel: P(n) = (Pret minim ofertat / Pret n) x punctaj maxim alocat.
| Criterion | Type |
|---|---|
Pretul ofertei Punctajul se acorda astfel: a) Pentru cel mai scazut dintre preturi se acorda punctajul maxim alocat; b) Pentru celelalte preturi ofertate punctajul P(n) se calculeaza proportional, astfel: P(n) = (Pret minim ofertat / Pret n) x punctaj maxim alocat. | Price |
Buyer
Name
MUNICIPIUL RESITA
Location
Resita, ROU
Website
Buyer profile
Identifier
3228764
Lots (3)
Road construction works including site preparation, environmental protection, utility relocation, construction and installation works, equipment, and site organization. The project aims to divert heavy traffic from central Reșița, improving traffic flow, safety, and reducing emissions.
Incomplete lot data. Additional classification CPV 45310000 (electrical installation work). Award criteria: quality only.
Incomplete lot data. Additional classification CPV 45316000 (installation work of lighting and signaling systems). Award criteria: quality only.
Procurement Details
Publication
04 Jun 2026
Deadline
15 Jul 2026, 12:00
Procedure
open
Contract
works
Duration
18 MONTH
Language
RON
Publication #
387647-2026
Classification
Performance: Romania
Documents (2)
Similar tenders
Romania – Road-maintenance works – Întreţinere drumuri asfaltate – acord cadru - 4 ani - Sector Criș.
Romania – Roadworks – Elaborare documentatie tehnica pentru obtinerea autorizatiei de construire (DTAC), proiect tehnic pentru executia lucrarilor (PT), asistenta tehnica din partea proiectantului pe perioada executarii lucrarilor si executie lucrari pentru obiectivul de investitii: Modernizare strada Apateului – tronson cu nr.28-30 - Conform C.F. NR. 207356, Municipiul Oradea, Judetul Bihor
Romania – Parking lot construction work – lucrări de execuție pentru investiția ”construire parcare în regim P+2E pentru parcare Long Term P5”
Romania – Park-and-ride facility construction work – Executie lucrari in cadrul proiectului ,,Terminal multimodal si baza Park & Ride"
Romania – Construction work for water and sewage pipelines – MS-CL-R02-Lot 01VN Lucrări pe sistemele de alimentare cu apă Vărgata, Miercurea Nirajului MS-CL-R02-Lot 02VN Lucrări pe sistemele de alimentare cu apa Gălești, Păsăreni MS-CL-R02-Lot 03VN Lucrări pe ssstemele de alimentare cu apă Gh Doja, Acățari MS-CL-R02-Lot 04TN Lucrări pe sistemele de alimentare cu apă Mica,Bahnea MS-CL-R02-Lot 05CS Lucrări pe sistemele de alimentare cu apă Cristuru Secuiesc
Romania – Construction work for highways, roads – PROIECTARE SI EXECUTIE “Autostrada Craiova – Filiasi si Drum Expres Filiasi – Targu Jiu – Lotul 4”
Opportunity Score
Confidence: 40%
Complexity: medium
26 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation