Access - WH HPC-Cluster

Access e.V.·Aachen, Germany·Expired · Jun 01, 2026·Open·Supplies
Structured notice only
Titre original de l'avis

Germany – Mainframe computer – Access - WH HPC-Cluster

55/100

Score d'opportunité

Needs reviewHigh complexity
SuppliesExpired
Pourquoi ce score ?

Opportunité

55 / 100

Complexité

70 / 100

Facteurs de risque

Buyer explicitly states the procurement is not a public contract under GWB, which may affect bidder rights and remedies...

The 28 kVA power limit at initial site may restrict hardware choices; relocation in 2028 adds logistical complexity.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Supplies contract
  • 1 lot
  • Duration 8 WEEK
  • Supply and delivery of a High Performance Computing (HPC) cluster meeting specified minimum performance and storage requirements.
  • Installation at existing data center (Intzestraße, Aachen) using existing water-cooled rack system.
Afficher le résumé complet

Open procedure for the supply and installation of a High Performance Computing (HPC) cluster for Access e.V. in Aachen, Germany. The cluster must support simulation-based digital twins, AI applications, and provide at least 900 CPUs, multiple GPUs, and 500 TB storage. The contract includes installation and 5-year maintenance. The deadline has been extended to 2026-07-06 12:00. No estimated value is published. The buyer claims the procurement is not subject to public procurement law, which may affect legal remedies.

Risques

Buyer explicitly states the procurement is not a public contract under GWB, which may affect bidder rights and remedies...

The 28 kVA power limit at initial site may restrict hardware choices; relocation in 2028 adds logistical complexity.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Cluster must have at least the computing power of current system (~900 CPUs, Intel Xeon Gold 6132 @ 2.60 GHz) and preferably significantly more.
  • Must include multiple GPUs.
  • Must support efficient parallelization of workloads on CPUs.

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price (without options) - weight 50%50%Quality criteria (B-Kriterien) - weight 50%50%

Acheteur

Localisation

Aachen, DEU

Identifiant

DE 121 684 573

Activité

Education

Lots (1)

LOT-0001

Access - WH HPC-Cluster

Supply and installation of a new HPC cluster to replace existing system. Must deliver computing power exceeding current ~900 CPUs (Intel Xeon Gold 6132 @ 2.60 GHz), include multiple GPUs, and provide at least 500 TB storage. The cluster will be initially installed in existing water-cooled racks at Intzestraße (max 28 kVA) and relocated to a new building in 2028. Includes 5-year maintenance.

SuppliesEU fundedElectronic submission

Localisation

DEA2D, Germany

Durée

8 WEEK

Catégorie

Mainframe computer

Critères d'attribution

Best price-quality ratio

Date limite

Expired Jul 06, 2026

Détails de la procédure

Date de publication
04 Jun 2026
Langues
German

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
385555-2026

Documents (2)

Appels d'offres similaires