BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Titre original de l'avis
Norway – Pipeline, piping, pipes, casing, tubing and related items – BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Score d'opportunité
Pourquoi ce score ?
Opportunité
60 / 100
Complexité
70 / 100
Facteurs de risque
Missing procurement documents: only the TED notice was analyzed. Crucial details on terms, conditions, specifications...
Specific technical requirements (waterproof concrete, deep sheet pitting, pressurized pipes Ø500mm+, steel pipes PN16)...
No procurement documents available
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Aperçu
Moderate opportunityFaits clés
- NOK 95M estimated value
- Supplies contract
- 1 lot
- Duration 46 MONTH
- Establishment of raw water pump station
- Execution of pipelines from ENT2 to ENT3 (land pipeline contract)
Afficher le résumé complet
This tender, issued by Gjøvik Municipality (Norway), is for the establishment of a raw water pump station as part of a backup water supply system for Gjøvik and Biri. The project is the second stage of a larger initiative and includes pipeline work, pump installation, and associated construction. The contract is valued at 95,000,000 NOK with a duration of 46 months. The procedure is a negotiated procedure with a call for competition (neg-w-call). The deadline for submission is 31 July 2026. The award is based on price (55%), climate/environment (30%), and implementation plan (15%). Only one lot is identified.
Risques
Missing procurement documents: only the TED notice was analyzed. Crucial details on terms, conditions, specifications...
Specific technical requirements (waterproof concrete, deep sheet pitting, pressurized pipes Ø500mm+, steel pipes PN16)...
No procurement documents available
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Sufficient financial capacity (annual accounts 2024/2025, credit rating ≤6 months old)
- Relevant experience in waterproof concrete, deep sheet pitting, pressurized pipes, pumps, and steel pipes (max 4 reference projects in last 10 years)
Certifications
- Legally established company (registration certificate or equivalent)
Les exigences peuvent être incomplètes.
Critères d'attribution
Lot 1
Acheteur
Localisation
Gjøvik, NOR
Site web
Profil acheteur
Identifiant
940155223
Activité
General public services
Lots (1)
LOT-0001
BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Establishment of a raw water pump station including execution of pipelines from ENT2 to the land pipeline contract (ENT3). Scope includes waterproof concrete, deep sheet pitting, pressurized stainless steel pipes, pump delivery/installation, and steel pipes. Part of a backup water system for Gjøvik and Biri.
EUR 8.8M
Valeur estimée
Localisation
Durée
Catégorie
Critères d'attribution
Date limite
Détails des critères
Price
Climate and environment
Implementation plan
Codes CPV supplémentaires
Afficher les données TED originales
Description TED originale
Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.
Détails de la procédure
- Date de publication
- 02 Jun 2026
- Langues
- English, Norwegian
Métadonnées de référence
- Base juridique
- 32014L0025
Identifiants de référence
- ID de l'appel d'offres
- 382098-2026
Documents (1)
Appels d'offres similaires
Switzerland – Construction work for water and sewage pipelines – CERM - Centre d'entretien routier des montagnes - La Chaux-de-Fonds - LOT GC01_Réseaux - CFC 13, 452, 453.2,454, 455.2, 456, 463, 465
Poland – Road construction works – Rozbudowa drogi krajowej nr 22 na odcinku Malbork -Królewo
Denmark – Construction work – Opførelse af bygværker til Kalundborg Central Renseanlæg F1.BA.01
Norway – Construction work – Tradesman services - Plumbing for Midt-Telemark and Nome municipalities.
France – Drinking-water treatment plant construction work – Marché de travaux dans le cadre de construction de l’UTEP de la Technopole et la reconfiguration des adductions des ressources de l’Est sur le territoire de la Commune de Saint Denis
France – Construction work for water and sewage pipelines – Réhabilitation de réseaux d’alimentation en eau potable, eau industrielle et assainissement
Score d'opportunité
Pourquoi ce score ?
Opportunité
60 / 100
Complexité
70 / 100
Facteurs de risque
Missing procurement documents: only the TED notice was analyzed. Crucial details on terms, conditions, specifications...
Specific technical requirements (waterproof concrete, deep sheet pitting, pressurized pipes Ø500mm+, steel pipes PN16)...
No procurement documents available