Construction of tunnels and shafts – MAXIMA

VA SYD·Malmö, Sweden·SEK 5000M | EUR 463.4M·Deadline Aug 31, 2026 · 6 days left·Neg W Call·Works
High valueStructured notice only
Titre original de l'avis

Sweden – Construction work for tunnels, shafts and subways – Byggnation av tunnlar och schakt – MAXIMA

60/100

Score d'opportunité

Needs reviewHigh complexity
WorksOpen
Pourquoi ce score ?

Opportunité

60 / 100

Complexité

90 / 100

Facteurs de risque

Key documents not analyzed; eligibility, required documents, technical specifications, and award criteria are unknown...

Tender structured data indicates EU-funded, but XML notice states no EU funds. This may affect funding conditions and r...

Submission deadline in 6 days

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • SEK 5000M estimated value
  • Works contract
  • 1 lot
  • Duration until Dec 2033
  • Construction of two sewage tunnels (North and South) with associated shafts and microtunnels
  • Civil engineering, building, and installation works for gravity flow sewage transport and stormwater storage
Afficher le résumé complet

This tender by VA SYD concerns the construction of tunnels and shafts for the MAXIMA sewage facility in Malmö, Sweden. The project comprises two separate contracts: North Tunnel (10.5 km, ~3m diameter) and South Tunnel (5.5 km, ~5m diameter), with bidders allowed to bid on one or both. The estimated total value is 5,000,000,000 SEK. The procedure is a negotiated procedure with call for competition (neg-w-call). Only one lot is officially listed (LOT-0001), but it encompasses both contracts. No procurement documents were analyzed, leading to significant information gaps on eligibility, award criteria, and submission requirements.

Risques

Key documents not analyzed; eligibility, required documents, technical specifications, and award criteria are unknown...

Tender structured data indicates EU-funded, but XML notice states no EU funds. This may affect funding conditions and r...

Submission deadline in 6 days

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Administrative

  • Bidders may submit offers for one or both tunnel contracts
  • Electronic submission required via provided URL
  • Language of submission: Swedish (only SWE language listed)

Les exigences peuvent être incomplètes.

Acheteur

Localisation

Malmö, SWE

Site web

www.vasyd.se

Identifiant

2220002378

Activité

General public services

Lots (1)

LOT-0001

Construction of tunnels and shafts – MAXIMA

All works related to the MAXIMA sewage tunnels, including both the North and South tunnel contracts. North tunnel: 10.5 km, ~3m diameter, 4 shafts, from southern Lund to Sjölunda in northeastern Malmö. South tunnel: 5.5 km, ~5m diameter, 11 shafts, 2 microtunnels, through central Malmö. Works include building, civil engineering, and installation for gravity flow sewage transport and stormwater storage.

WorksEU fundedElectronic submission

EUR 463.4M

Valeur estimée

Localisation

Malmö, Sweden

Durée

Jan 2028 - Dec 2033

Catégorie

Construction work for tunnels

Date limite

Deadline Aug 31, 2026

Détails de la procédure

Date de publication
02 Jun 2026
Langues
Swedish

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
379680-2026

Documents (1)

Appels d'offres similaires