Germany – Wall-covering and wall-papering work – Umbau EG in IMC Turm 2 - Innenputz- und Malerarbeiten
Opportunity Score
Confidence: 65%
Complexity: medium
15 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender for interior plastering and painting works (including wall coverings, floor coatings, and varnishing) for the conversion of an intermediate care unit (IMC) in the ground floor of Tower 2 at BG Klinik Ludwigshafen. The works are divided into two construction phases with a break of approximately 2-3 months. The contract duration is 7 months. Submission deadline: 2026-07-02T10:00:00. Award criterion: price (100%).
Strengths
Documents available
Open procedure
Medium complexity
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Submission via DTVP portal only
- Electronic submission required
- Language: German
Award Criteria
Gesamtpreis
Gesamtpreis
| Criterion | Type |
|---|---|
Gesamtpreis Gesamtpreis | Price |
Buyer
Name
BG Kliniken Ludwigshafen und Tübingen gGmbH
Location
Ludwigshafen, DEU
Website
Identifier
992-80310-93
Lots (1)
Interior plastering (gypsum and lime-cement), painting, wallpapering, floor coating, and varnishing of metal frames in the ground floor and basement of Tower 2 for the IMC conversion. Works in two phases with a 2-3 month interruption.
Procurement Details
Publication
01 Jun 2026
Deadline
02 Jul 2026, 10:00
Procedure
open
Contract
works
Duration
7 MONTH
Language
DEU
Publication #
377978-2026
Classification
Performance: Germany
Documents (2)
Similar tenders
Germany – Electrical wiring and fitting work – Elektroarbeiten KG 440+450 für das Röntgen-Gymnasium Remscheid
Germany – Heating, ventilation and air-conditioning installation work – Neubau Hort Zusmarshausen, Heizungsanlage
Germany – Construction work for pipelines, communication and power lines – Neubau Betriebsgebäude mit Fahrzeughalle, ZKA Chemnitz - Technische Außenanlagen
Germany – Tiling work – Fliesenarbeiten Gebäude Ganzjahrescampingplatz
Germany – Bridge construction work – B 103 Behelfsbrücke üb. die Müritz-Elde-Wasserstraße in Plau
Germany – Ancillary works for electricity power lines – Schulprojekt Kardinal-von-Galen-Schule - Elektroinstallationen Starkstrom inkl. Beleuchtungsmontage
Opportunity Score
Confidence: 65%
Complexity: medium
15 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation