Croatia – Construction work for halls of residence – Izgradnja Paviljona 3 studentskog smještaja u Sveučilišnom kampusu na Trsatu u Rijeci
Opportunity Score
Confidence: 60%
Complexity: high
14 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender for the construction of Pavilion 3 student accommodation at the University of Rijeka Campus on Trsat. The project involves a 5,828 m² building with 284 beds, financed by EU ERDF funds. Single lot with an estimated value of €11,360,000. Deadline for tenders: 2026-07-03 at 10:00 UTC. Award criteria: 70% price, 30% quality. Language: Croatian. Electronic submission required.
Strengths
Documents available
Open procedure
14 days left
Risks
Submission deadline in 14 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Open procedure; electronic submission is mandatory via the e-Procurement platform (Open portal).
- Tenders must be submitted in Croatian language.
- Variants and multiple tenders are not allowed.
Award Criteria
Cijena ponude
Cijena ponude
| Criterion | Type |
|---|---|
Cijena ponude Cijena ponude | Price |
Buyer
Name
Sveučilište u Rijeci
Location
Rijeka, HRV
Website
Identifier
64218323816
Lots (1)
Construction of a free-standing public and social purpose building with 100 accommodation units (60 four-bed, 4 two-bed, 36 single-bed) totalling 284 beds, gross floor area 5,828 m² (969.10 m² underground, 4,585.90 m² above ground). Duration 480 days.
Procurement Details
Publication
27 May 2026
Deadline
03 Jul 2026, 10:00
Procedure
open
Contract
works
Duration
480 DAY
Language
HRV
Publication #
367064-2026
Classification
Performance: Croatia
Documents (2)
Similar tenders
Croatia – Railway construction works – Obnova kolosijeka i ugradnja skretnica u kolodvoru Zagreb GK
Croatia – Construction work for halls of residence – Izgradnja Paviljona 3 studentskog smještaja u Sveučilišnom kampusu na Trsatu u Rijeci
Croatia – Construction, foundation and surface works for highways, roads – Izgradnja DC8, dionica TTTS - Dugi Rat sa spojnim cestama, Faza 2: od čvora TTTS uključujući čvorište Stara Podstrana s pristupnim cestama
Croatia – Road-maintenance works – Održavanje nogostupa nerazvrstanih cesta i pješačkih javnoprometnih površina s pratećom urbanom opremom na području Grada Splita
Croatia – Construction work for school buildings – Radovi na uklanjanju postojeće i izgradnji nove zgrade Osnovne škole Antuna Mihanovića Petrovsko sa školskom sportskom dvoranom
Croatia – Construction, foundation and surface works for highways, roads – Izgradnja čvorova Njivice I i Njivice II na državnoj cesti D8 u Šibeniku
Opportunity Score
Confidence: 60%
Complexity: high
14 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation