Iceland – Construction work for electricity power lines – CABLE PLOUGHING - STRENGLÖGN -Vatnshamrar að Seleyri - Vesturland
Opportunity Score
Confidence: 0%
Complexity: low
2 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
Buyer
Lots (1)
The project comprises one work site; however, the cable installation is divided into two sections: firstly, a new main distribution cable installation and secondly, a cable intended to replace the existing overhead line. One pad-mounted substation shall be installed along the route. The scope of works includes installation of: six (6) single-core 1x240 mm² 36 kV high-voltage cables over approximately 10 km; and three (3) 150 mm² 24 kV high-voltage cables over approximately 7 km. Accordingly, a total of six to seven (6–7) cables shall be simultaneously ploughed and installed in parallel over an approximately 10 km section. The Purchaser also requests installation of fibre optic ducting in parallel with the works. It is anticipated that the works will commence on 10 August 2026 and be completed within 10 weeks thereafter. The commencement date may be delayed should the cables not arrive in Iceland in due time. In such event, the contract period shall be extended correspondingly to reflect the delay.
Procurement Details
Publication
18 May 2026
Deadline
19 Jun 2026, 14:00
Procedure
open
Contract
works
Language
ISL
Publication #
341591-2026
Classification
Performance: Iceland
Documents (2)
Similar tenders
Iceland – Construction work for school buildings – Construction of an extension of Seyðisfjarðarskóli, Múlaþing
Iceland – Construction work for bridges – Vestfjarðarvegur (60) around Gufudalssveit Skálanes - Hallsteinsnes
Iceland – Construction work – Earthworks - Laekjargata 1
Iceland – Building construction work – Rofahús Hvolsvelli
Iceland – General construction work for pipelines – NTA25 - Fuel
Iceland – Excavating and earthmoving work – Utilities, excavation and surface finishing
Opportunity Score
Confidence: 0%
Complexity: low
2 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation