Austria – Fuses – Dynamisches Beschaffungssystem - NH-Sicherungsleisten
Opportunity Score
Confidence: 30%
Complexity: low
—
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This notice establishes a Dynamic Purchasing System (DPS) for the supply of NH-type fuse strips and NH-type fuse load break strips. The DPS is operated by KNG-Kärnten Netz GmbH in Austria and is open for applications until 31 December 2031. The system is limited to a maximum of 8 participants. No estimated value, selection criteria, or award criteria are specified in the provided data.
Strengths
Documents available
Low complexity
Electronic submission
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Electronic submission required via Open portal
- Submission language: German only.
- Registration on the buyer's procurement portal is required.
Buyer
Name
KNG-Kärnten Netz GmbH
Location
Klagenfurt, AUT
Website
Buyer profile
Identifier
FN 246961d
Lots (1)
Supply of NH fuse strips and NH fuse load break strips under a dynamic purchasing system.
Procurement Details
Publication
17 Apr 2025
Deadline
—
Procedure
open
Contract
supplies
Language
DEU
Publication #
255600-2025
Classification
Performance: Austria
Documents (2)
Similar tenders
Austria – Microscopes – Multimodales IR- und Raman-Spektroskopiesystem
Austria – Electrical materials – Rahmenvereinbarung für die Lieferung, Einbau und Inbetriebnahme von Energiemesstechnik
Austria – Miscellaneous furniture – KFN_XXX_5412 Serienmöbel
Austria – Laboratory, optical and precision equipments (excl. glasses) – AKH CTMT - 6248 - Floureszenz Analysesystem
Austria – Software package and information systems – RV Erneuerung Netzleittechnik
Austria – Data-processing machines (hardware) – WN-3210080249 - Datengateways (DG) für das Smart Metering System
Opportunity Score
Confidence: 30%
Complexity: low
—
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation