Norway – Ventilation installation work – 77.25.XX Bodin Sixth form college ventilation such as building wing K
Opportunity Score
Why this score?
Opportunity
0 / 100
Complexity
0 / 100
Risk factors
Submission deadline in 14 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Tender facts
- Contracting authority
- Sweco Norge AS (Hovedenhet)
- Country
- Norway
- CPV
- 45331210 - Ventilation installation work +2 more
- Deadline
- Dec 04, 2026
- Estimated value
- NOK 10M (approx. EUR 943k)
AI tender analysis
Tenderwize prepares an AI analysis of this tender based on the TED notice and procurement documents: scope of work, key requirements, eligibility criteria, risks and questions for the buyer. The analysis is generated when the tender is opened.
Buyer
Location
OSLO, NOR
Website
Identifier
967032271
Activity
Water-related activities
Lots (1)
LOT-0000
77.25.XX Bodin Sixth form college ventilation such as building wing K
Nordland County would like to carry out ventilation reconstruction for wing K at Bodinvideregående school Mørkved. Improvement of the ventilation installations at the school is the main assignment in the project. K302 Air treatment plant.Other contracts: K301 Plumbing, K401 Electro technical installations, K203 Construction Work. The school was built in 1984 and is divided in wings, from A to and including G.Fløy K was rebuilt in 2003. Planned start in wing K is at the end of the school year, summer 2027 approx. middle of June 27.The reconstruction area amounts to approx. 2,850 m2. Information on planned work that shall be carried out in summer 2027, weeks 24-32. 1st floor. wing K:• Construction work, disassembly of existing ceilings, reassembly of ceilings as well as some new ceilings.• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/heating/lighting. Cabling towards central processing system. 2nd floor wing K • Ventilation, insertion on the existing ventilation channels for mounting of fire dampers VAV-damper for control of ventilation.• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work in the floor.• Electrical work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.3 floor. wing K• Ventilation, insertion on the existing ventilation channels for assembly of fire dampers VAV-damper for control of ventilation.• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work.• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.•Technical room 1 floor. Wing K, 2 aggregates are to be renovated and delivered with a new automation for control from the control system. Something is altered on the intake channel system001. On all 3 aggregates, parts of the chassi internal cover shall be covered with new bottom plates. The joint intake for all aggregates is to be altered.
EUR 943k
Estimated value
Location
Duration
Category
Award details
Nordland County would like to carry out ventilation reconstruction for wing K at Bodinvideregående school Mørkved. Improvement of the ventilation installations at the school is the main assignment in the project. K302 Air treatment plant.Other contracts: K301 Plumbing, K401 Electro technical installations, K203 Construction Work. The school was built in 1984 and is divided in wings, from A to and including G.Fløy K was rebuilt in 2003. Planned start in wing K is at the end of the school year, summer 2027 approx. middle of June 27.The reconstruction area amounts to approx. 2,850 m2. Information on planned work that shall be carried out in summer 2027, weeks 24-32. 1st floor. wing K:• Construction work, disassembly of existing ceilings, reassembly of ceilings as well as some new ceilings.• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/heating/lighting. Cabling towards central processing system. 2nd floor wing K • Ventilation, insertion on the existing ventilation channels for mounting of fire dampers VAV-damper for control of ventilation.• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work in the floor.• Electrical work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.3 floor. wing K• Ventilation, insertion on the existing ventilation channels for assembly of fire dampers VAV-damper for control of ventilation.• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work.• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.•Technical room 1 floor. Wing K, 2 aggregates are to be renovated and delivered with a new automation for control from the control system. Something is altered on the intake channel system001. On all 3 aggregates, parts of the chassi internal cover shall be covered with new bottom plates. The joint intake for all aggregates is to be altered.
Additional CPV codes
Procurement Details
- Publication date
- 18 Nov 2026
- Languages
- English, Norwegian
Reference metadata
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 806569-2026
Documents (1)
Similar tenders
Germany – Ventilation installation work – Lüftung
Poland – Works for complete or part construction and civil engineering work – Zaprojektowanie, wybudowanie i uruchomienie Instalacji Termicznego Przekształcania Odpadów pochodzenia komunalnego z wysokosprawnym odzyskiem energii (ITPO) w Wysokiem Mazowieckiem
Germany – Ventilation installation work – Neubau des Rathauses in Straelen - Lüftungsanlagen
Poland – Construction work – Przebudowa budynku Urzędu Skarbowego w Lubaczowie w ramach zadania: „Przebudowa w celu poprawy efektywności energetycznej budynku Urzędu Skarbowego w Lubaczowie przy ul. Jana III Sobieskiego 6”.
Germany – Ventilation installation work – Neubau eines 8-gruppigen Kinderhauses in Amberg - Lüftungsarbeiten
Bulgaria – Construction work – Топлоизолиране на фасадни стени на Студентско общежитие блок № 59, вх. А, Б, В, Г на Технически университет – София
Opportunity Score
Why this score?
Opportunity
0 / 100
Complexity
0 / 100
Risk factors
Submission deadline in 14 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications