Bridge maintenance in Telemark, 2027–2028
Original notice title
Norway – Construction work for bridges and tunnels, shafts and subways – Bridge maintenance Telemark 2027-2028
Opportunity Score
Why this score?
Opportunity
0 / 100
Complexity
0 / 100
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Tender facts
- Contracting authority
- Telemark fylkeskommune
- Country
- Norway
- CPV
- 45221000 - Construction work for bridges and tunnels, shafts and subways +6 more
- Deadline
- Jan 06, 2027
AI tender analysis
Tenderwize prepares an AI analysis of this tender based on the TED notice and procurement documents: scope of work, key requirements, eligibility criteria, risks and questions for the buyer. The analysis is generated when the tender is opened.
Award Criteria
Lot 1
Buyer
Location
Skien, NOR
Identifier
929882989
Activity
Urban railway, tramway, trolleybus or bus services
Lots (1)
LOT-0001
Bridge maintenance Telemark 2027-2028
The nature and scope of the work The assignment includes maintenance work on bridges in Telemark county. The work shall be carried out on 13 fixed bridges. The contract also includes process based work under Bridge 50. The contract will be valid from when the contract is signed until 31.12.2028, with an option for an extension for up to 2 x 12 months. More information can be found in the attached tender documentation. If there is discrepancy between the information in Hyyr and the attached tender documentation (chapter A-E including annex), the attached tender documentation ranks before the other information in Hyyr. Tender conference A tender conference will be held: 23.11.2026, kl. 09.00, i Torggata 18, 3717 Skien, meeting room Bandak 3rd floor.
Location
Duration
Category
Award Criteria
Award details
Under this criterium the price element will be assessed.
The Public Procurement Act § 5b states that public procurements should weight climate and environmental considerations with a minimum of 30%. This is done through award criteria. If there is a better climate or environmental benefit, the award of contract can be replaced or combined with climate and environmental requirements. The award of climate and environmental considerations (30 %) is not relevant in this contract and is replaced by the requirements for materials and passenger transport, see the requirement specifications in C chapter and under respective processes for the factory concrete. Justification: Based on emission factors given in VegLCA and previously reported amounts on consumption, steel (railings) contributes with 35%, concrete 12% and passenger transport 13% of the total emissions of 337 tonnes CO2-ekv. Despite the fact that steel makes up the largest share of the total emissions, it is considered as limited possibilities for reduction - especially compared to other major emission factors - through competition or requirements in this contract. Concrete cast on site is the second largest emission factor in accordance with the result in VegLCA. As concrete in low carbone class 40 is available in the market for the contract, minimum requirements can be made as a part of the tender documentation. This will ensure that the contract will get concrete delivered with the lowest possible emissions, based on what is available in the market for the notice. Such a requirement will ensure that the contract will have good climate effect by reducing the climate gas footprint from the second largest climate driver in the contract by 40% (16.4 tonne co2-ekv.), compared with industry references. If the project instead chooses to premiere the use of low carbon concrete through the award criteria, the same climate gas reduction cannot be guaranteed. It is therefore considered better to set requirements for the use of low carbon concrete as this will give the lowest greenhouse gas emissions based on the available materials in the market at the time of the notice. Passenger transport makes up 13% of the total emissions, and is the second largest contributor to CO2 emissions. A minimum requirement will ensure that a large number of light vehicles offered and used are emission free. An award criteria will award zero emissions, but price or other award criteria could nevertheless lead to the contract being awarded to a supplier who offers fossil-driven vehicles. The market for emission free light vehicles is considered to be sufficiently mature and there is an available charging infrastructure and the necessary capacity. By requiring 90% of driven km to be emission free, the contract achieves a further reduction of 37 tonne of CO2-ekv. See annex 2026-11-04 Award of Climate and Environment new bridge contract for detailed justification for choosing the requirements.
Additional CPV codes
Procurement Details
- Publication date
- 11 Nov 2026
- Languages
- English, Norwegian
Reference metadata
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 787419-2026
Documents (1)
Similar tenders
Germany – Construction work – BMP A 9 - BW 27_1 Ersatzneubau Bruecke
Romania – Road bridge construction work – Proiectare si Execuție Lucrări pentru obiectivul de investiție “RECONSTRUIRE POD PESTE PÂRÂUL TIMIȘUL SEC ȘI GRUPUL DE LINII CF TRIAJ PE STR. TIMIȘUL SEC, MUNICIPIUL BRAȘOV”
Czechia – Repair, maintenance and associated services related to roads and other equipment – BĚŽNÁ A ZIMNÍ ÚDRŽBA SILNIC STŘEDOČESKÉHO KRAJE – OBLAST KLADNO
Romania – Road-maintenance works – Acord cadru „Întreținerea curentă și periodică a străzilor, trotuarelor și aleilor din Municipiul Brăila, în perioada 2027 – 2030”
Italy – Road-maintenance works – DG 53-26 Accordo Quadro quadriennale per l'esecuzione di lavori di Manutenzione Programmata per il risanamento e il potenziamento dell'itinerario E45-E55.
Norway – Construction work – 2027 Framework agreement Emergency excavation preparedness water and sewage.
Opportunity Score
Why this score?
Opportunity
0 / 100
Complexity
0 / 100
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications