Tenderwize
Back to tender search

New Pumping Station and District Heating Infrastructure

MUNICIPAL WATER, DRAINAGE & DISTRICT HEATING COMPANY OF KOZANI·ΚΟΖΑΝΗ, Greece·EUR 13.4M·Deadline Nov 19, 2026 · 5 days left·Open·Works
High value
Original notice title

Greece – Pumping station construction work – Modifications, construction of a new pumping station & accompanying infrastructure for the interconnection of Kozani district heating with the unified district heating network of Western Macedonia

0/100

Opportunity Score

High riskLow complexity
WorksOpen
Why this score?

Opportunity

0 / 100

Complexity

0 / 100

Risk factors

Submission deadline in 5 days

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Tender facts

Contracting authority
MUNICIPAL WATER, DRAINAGE & DISTRICT HEATING COMPANY OF KOZANI
Country
Greece
CPV
45232152 - Pumping station construction work
Deadline
Nov 19, 2026
Estimated value
EUR 13.4M

AI tender analysis

Tenderwize prepares an AI analysis of this tender based on the TED notice and procurement documents: scope of work, key requirements, eligibility criteria, risks and questions for the buyer. The analysis is generated when the tender is opened.

Award Criteria

Lot 1

The criterion for awarding the contract is the most economically advantageous offer based only on price (lowest price) with a study evaluation. According to paragraph 4 of article 50, the evaluation of the study during the contract award procedure of the article in question concerns only the control of the completeness and the agreement of the study with the provisions of the contract documents and in particular with the Regulation on Project Studies, establishing the compliance or non-compliance of the study with them (compliance table) without scoring

Buyer

Location

ΚΟΖΑΝΗ, GRC

Buyer profile

Open profile

Identifier

1007.F00025.0001

Activity

Water-related activities

Lots (1)

LOT-0001

Modifications, construction of a new pumping station & accompanying infrastructure for the interconnection of Kozani district heating with the unified district heating network of Western Macedonia

The project concerns the construction of pumping station facilities for the interconnection of Kozani district heating with the new and under construction thermal energy production facilities within the Kardia Thermal Power Plant site through the new thermal energy transfer system under construction, consisting of pipes of nominal diameter DN700mm DN600mm DN450mm with hot/superheated water as the carrier. In detail, it concerns the construction of the following distinct facilities: Installations (pump stations and other equipment) for interconnection in a field granted to DEYAK within the Kardia Thermal Power Plant/PPC referred to as "KARDIAS PUMP STATION". The facilities to be implemented with the project include the following main equipment and works: Hot water circulation pumping station for the transport system. Hot water circulation pump station of the production system Heat exchangers for the hydraulic separation of the existing district heating transport systems DEYAK and production. Other auxiliary equipment (pressure regulation and expansion valve reception, water treatment and replenishment, filtration, addition of chemical additives, safety devices, energy meters, etc.) Connection of the new facilities with the existing or new facilities to be implemented (transport pipeline, production facilities) (water supply, sewage, strong and weak currents and others). Automation control and remote management system for the remote monitoring of the Kardias Pumping Station. The system will fully cooperate with the existing control/remote management system of the district heating facilities control center and will essentially be an extension of it. Installations-renovation works at the existing district heating pumping station in the Kasla area of Kozani (replacement of pumping units of pumping station A2 and other equipment, so that the pumping station meets the requirements of the new transmission system as well as modifications to the routing of the transmission pipelines within the pumping station site), hereinafter referred to as "KASLA PUMP STATION". The works mainly concern Replacement of the main pumping units of pumping station A2 with their accompanying works Replacement of existing transformers with new ones to cover the increased electrical power requirements due to the new equipment. Replacement of existing speed regulators of pumping units of pumping station A1. Modification of the routing of the pre-insulated pipelines of the transmission system within the district heating installation site. Redesign of the existing operational control automation system of the main pumping stations. Upgrading of the supply lines of strong and weak currents of the new pumping complexes. Control automation and remote management system for the remote monitoring of the Kardia Pumping Station (see above-Kardia Pumping Station) as well as the Drepano valve station. The system will fully cooperate with the existing control/remote management system of the district heating installation control center and will essentially be an extension of it. With the implementation of the installations, the nominal transmission capacity of the system will be 195MWth.

WorksEU fundedElectronic submission

EUR 13.4M

Estimated value

Location

EL531, Greece

Duration

15 MONTH

Category

Pumping station construction work

Award Criteria

Price

Procurement Details

Publication date
11 Nov 2026
Languages
Greek

Reference metadata

Legal basis
32014L0025

Reference IDs

Tender ID
786355-2026

Documents (2)

Similar tenders

Cookies & Privacy

With your consent, we use Google Analytics, Microsoft Clarity (session recordings) and Google Ads cookies to understand how Tenderwize is used and to measure our advertising. You can change your choice at any time via “Cookie Settings” in the footer. Cookie Policy · Privacy Policy