Denmark – Construction work – North Sea I, South, Offshore Wind Farm

Danish Energy AgencyKøbenhavn V, DenmarkDKK 6,600,000,000 / ~EUR 883,226,722861 days leftopen
60

Opportunity Score

Confidence: 65%

Complexity: high

861 days

Deadline

works

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This is an open procedure for a concession to establish and operate a 1 GW offshore wind farm (North Sea I, South) in the Danish North Sea. The project is supported by a capability-based two-way contract for difference (CfD) for 20 years, with a subsidy cap of 6.6 billion DKK (2025 prices). The concessionaire bears all commercial risks except for certain defence-related costs and preliminary investigations. The award criterion is the lowest bid price (DKK/MWh). The tender requires a minimum of one reference for a large-scale offshore energy project with CAPEX ≥ 500M DKK, ≥ 10m water depth, ≥ 25-year duration. The submission deadline is 23 October 2028 at 14:00 local Danish time. Only the first lot (LOT-0000) is detailed; additional lot entries lack titles, descriptions, and deadlines, indicating a data extraction issue.

Strengths

Documents available

Open procedure

861 days left

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Bid price (DKK/MWh) must be offered in Tender Submission Letter; award to lowest bid price
  • Tender validity period: 8 months from submission deadline, extendable upon request
  • ESPD required as preliminary proof; full documentation upon request

Award Criteria

Bid price

Award of the Concession Agreement to the most economically advantageous tender will take place on the basis of the award criterion, “price”. The award criterion, “price”, will be assessed on the basis of the bid price offered by the Tenderer in the Tender Submission Letter (Annex A), in the Procurement Specifications. The offered bid price must constitute a price per unit of electricity in “DKK”/MWh excl. VAT, which the Tenderer will be guaranteed for the duration of the 20-year subsidy period. The bid price of the Successful Tenderer will constitute the so-called “strike price” under the Concession agreement, cf. Appendix F (Concession Agreement) and Appendix 3 (Capability-Based Two-Way Contract for Difference). The Tenderer submitting the tender with the lowest offered bid price will be awarded the right and obligation to establish an offshore wind farm in the concession area, as set out in Appendix 2 (Location of the Concession Area).

Type: Price

Buyer

Name

Danish Energy Agency

Location

København V, DNK

Website

ens.dk/

Buyer profile

Open profile

Identifier

59778714

Lots (1)

#LOT-0000North Sea I, South, Offshore Wind Farm

Establishment and operation of one offshore wind farm with minimum capacity of 1 GW, including optional overplanting and potential for innovative energy production (e.g., Power-to-X). The concession area is in the Danish North Sea (NUTS: DK041). The concession agreement has a duration of 40 years, with a 20-year CfD subsidy period.

DKK 6,600,000,00045000000, 31121320, 31121330, 31121340, 31160000, 31170000, 31213400, 31300000, 45244000, 45244100DNK

Procurement Details

Publication

20 Nov 2025

Deadline

23 Oct 2028, 12:00

Procedure

open

Contract

works

Duration

40 YEAR

Language

ENG

Publication #

774914-2025

Classification

Performance: Denmark

Documents (2)