Tenderwize
Back to tender search

Electricity supply for the Madrid Assembly

Mesa de la Asamblea de Madrid·Madrid, Spain·EUR 1M·Expired · Oct 19, 2026·Open·Supplies
High value
Original notice title

Spain – Electricity – CPASU/2026/05: Suministro de energía eléctrica para la Asamblea de Madrid.

63/100

Opportunity Score

Needs reviewMedium complexity
SuppliesExpired
Why this score?

Opportunity

63 / 100

Complexity

48 / 100

Risk factors

Annual turnover and completed-works criteria are identified, but their thresholds, reference periods, and evidence requ...

The fixed per-kWh price is supplemented by system charges and network access tariffs, but the allocation of regulated-c...

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Tender facts

Contracting authority
Mesa de la Asamblea de Madrid
Country
Spain
CPV
09310000 - Electricity
Deadline
Oct 19, 2026
Estimated value
EUR 1M

Overview

Moderate opportunity

Key Facts

  • EUR 1M estimated value
  • Supplies contract
  • 1 lot
  • Duration 2 YEAR
  • Supply electricity to the Madrid Assembly’s common consumption point serving two buildings and their installations.
  • Provide electricity with a 100% renewable-origin certificate.
Show full summary

Open procedure for a two-year supply of 100% renewable-certified electricity to the Madrid Assembly’s common consumption point serving two buildings and their installations. The estimated overall value is EUR 1,020,000. Electronic submission is required, Spanish is the stated language, and the sole award criterion is price. The notice provides limited procurement detail; the underlying tender documents were not analyzed.

Risks

Annual turnover and completed-works criteria are identified, but their thresholds, reference periods, and evidence requ...

The fixed per-kWh price is supplemented by system charges and network access tariffs, but the allocation of regulated-c...

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Certifications

  • The electricity must be certified as 100% renewable-origin energy.

Administrative

  • Electronic submission is required through the stated Spanish public procurement platform.
  • The stated submission language is Spanish.

Award Criteria

Lot 1

Price-only award criterion, weighted at 100%; source weight code: poi-exa. — 100%

Buyer

Location

Madrid, ESP

Buyer profile

Open profile

Identifier

20938820137642

Activity

General public services

Lots (1)

LOT-0000

Electricity supply for the Madrid Assembly

Supply of electricity with a 100% renewable-origin certificate to the Madrid Assembly’s consumption point, covering two buildings and associated installations. The contract uses a fixed unit price per kWh, plus electricity-system charges and network access tariffs. The lot duration is two years.

SuppliesEU fundedElectronic submission

EUR 1M

Estimated value

Location

ES300, Spain

Duration

2 YEAR

Category

Electricity

Award Criteria

Price

Deadline

Expired Oct 19, 2026

Procurement Details

Publication date
04 Oct 2026
Languages
Spanish

Reference metadata

Legal basis
32014L0024

Reference IDs

Tender ID
681510-2026

Documents (1)

Similar tenders

Cookies & Privacy

With your consent, we use Google Analytics, Microsoft Clarity (session recordings) and Google Ads cookies to understand how Tenderwize is used and to measure our advertising. You can change your choice at any time via “Cookie Settings” in the footer. Cookie Policy · Privacy Policy