Austria-Vienna: Overhead power lines
Opportunity Score
Confidence: 50%
Complexity: low
—
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
The notice announces a qualification system (Prüfsystem) for the supply of overhead power line cables, high-temperature cables, and earth cables with integrated optical fibre (OPGW) for the Austrian Power Grid (APG) network. This is not a direct tender but a prequalification mechanism. Successful applicants will be invited to subsequent contracts without further publication.
Strengths
Open procedure
Low complexity
Risks
No procurement documents available
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Participation in the qualification system (Prüfsystem) is required to be considered for future contracts.
- All applications must be submitted via the Vemap platform (Open portal).
- Language: German (DEU) required for submissions.
Buyer
Lots (1)
Single lot covering the supply of overhead line conductors, high-temperature conductors, and earth wires with integrated OPGW for the APG network.
Procurement Details
Publication
24 Oct 2022
Deadline
—
Procedure
open
Contract
supplies
Language
DEU
Publication #
589131-2022
Classification
Opportunity Score
Confidence: 50%
Complexity: low
—
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation